Atrium Smoke Extraction Systems
(Design, Supply, Installation, Testing, Commissioning & AMC for Atrium Smoke Control Systems)
(Design, Supply, Installation, Testing, Commissioning & AMC for Atrium Smoke Control Systems)
Bring architectural openness and engineered smoke management together with Atrium Smoke Extraction Systems from Compress India. We help project teams plan smoke exhaust, replacement air, controls and system integration around the building’s layout and approved fire strategy.
Whether you are developing a shopping mall, hotel, commercial tower or public building, contact Compress India for a project-specific assessment and quotation.

A dependable atrium smoke control system requires coordinated engineering from initial calculations through operational testing. Compress India provides a project delivery approach covering equipment selection, installation, commissioning and maintenance, with specialist analysis and approval support defined to suit your scope.
Share your architectural drawings, fire consultant’s requirements and project schedule to discuss a suitable solution.
What Is an Atrium Smoke Extraction System?
An atrium smoke extraction system removes smoke from a large internal space connecting multiple building levels. Typically, high-level extraction works with low-level make-up air, smoke reservoirs, detection and automatic controls to manage smoke movement during a fire.
Its purpose is to support acceptable evacuation conditions for the design period and limit smoke spread into connected areas. The system forms part of the wider fire safety strategy alongside compartmentation, suppression, alarms and protected escape routes.
Why Atriums Need Dedicated Smoke Extraction
Rapid Vertical Smoke Movement in Tall Open Spaces
An open atrium can provide a vertical path for rising smoke. Dedicated smoke extraction helps manage this movement before smoke compromises connected floors and circulation areas.
Smoke Accumulation Beneath Atrium Roofs
Smoke reaching the upper atrium can accumulate beneath the roof and form a descending layer. High-level exhaust removes smoke from this collection zone.
Smoke Spread to Connected Floors & Balconies
Open balconies and communicating floors can be exposed as smoke spreads. Extraction, smoke barriers and appropriate separation must work together to address these pathways.
Maintaining a Tenable Smoke-Free Layer
The design aims to preserve a sufficiently clear lower layer for the required period. Assessment considers visibility, temperature and exposure to harmful combustion products.
Protecting Escape Routes & Occupied Floors
Smoke management supports evacuation by limiting smoke exposure along designated routes. Its effectiveness depends on the building layout, fire scenario and coordination with protected exits.
Supporting Firefighting & Rescue Operations
Controlled smoke movement can improve access and operating conditions for emergency responders. Firefighter controls allow intervention according to the approved system strategy.
Fire NOC & Building Code Compliance
A documented smoke-control design supports fire approval submissions and inspections. Applicable requirements and acceptance conditions must be established with the project consultant and relevant authority.
How an Atrium Smoke Extraction System Works
1. Fire & Smoke Are Detected
The fire detection system identifies an alarm condition and sends the required inputs to the smoke-control system according to the approved cause-and-effect matrix.
2. Hot Smoke Rises Through the Atrium
Buoyant smoke rises while drawing surrounding air into the plume. Fire size, ceiling height and architectural obstructions influence its movement and volume.
3. Smoke Collects Within the Smoke Reservoir
The roof geometry and designated reservoir boundaries provide a collection region. Where specified, smoke curtains help contain smoke within the intended extraction area.
4. Atrium Smoke Exhaust Fans Start Automatically
Fans start through a controlled sequence that establishes the required extraction path. Damper status, electrical availability and relevant interlocks are incorporated into the design.
5. Smoke Is Extracted at High Level
Exhaust inlets remove smoke from the upper layer and discharge it outdoors. Discharge locations must avoid exposing escape routes, neighbouring openings and replacement-air intakes.
6. Make-Up Air Enters Below the Smoke Layer
Replacement air enters through planned openings or mechanical supply systems. Its distribution must support exhaust operation without significantly disturbing the smoke plume.
7. Smoke Curtains & Barriers Control Smoke Spread
Specified curtains and barriers channel or contain smoke within designated areas. Their positions and deployment must remain compatible with evacuation and the overall fire strategy.
8. Fire Alarm & Smoke Control Panels Coordinate the System
Control panels manage fans, dampers, curtains and feedback signals. The precise operating sequence is project-specific; these functions may overlap rather than occur as eight separate stages.
Understanding Smoke Behaviour in an Atrium
Smoke Buoyancy & Thermal Plumes
Smoke generally rises because heated gases are less dense than surrounding air. As the plume entrains cooler air, its temperature and buoyancy change.
Smoke Layer Formation
Smoke accumulating above the occupied zone forms an upper layer. Its depth changes with smoke inflow, extraction performance, heat losses and the available reservoir volume.
Smoke Layer Interface Height
The interface describes the transition between the upper smoke layer and clearer air below. Maintaining its design height is an important smoke-control objective.
Smoke Stratification in Tall Atriums
A plume may lose buoyancy before reaching roof level, particularly where temperature gradients exist. This can affect both smoke detection and the assumed extraction behaviour.
Entrainment of Air into the Smoke Plume
Rising smoke draws in surrounding air, increasing the mass that must be managed. Extraction sizing therefore considers plume behaviour, not simply the initial combustion products.
Effect of Atrium Height & Geometry
Height, roof shape, changes in cross-section and internal obstructions affect smoke movement. Two atriums with similar volumes may require different extraction arrangements.
Effect of Balconies, Openings & Connected Floors
Balcony edges and adjacent openings can redirect smoke and create spill plumes. These features must be represented in the design calculations and scenario assessment.
Types of Smoke Plumes in Atrium Design
Axisymmetric Smoke Plume
An axisymmetric plume is associated with a fire rising relatively freely away from walls and major obstructions. Its applicability depends on the actual fire location.
Balcony Spill Plume
A balcony spill plume forms when smoke flows from an adjacent space and spills over an edge into the atrium, entraining additional air as it rises.
Window Plume
A window plume emerges through a vertical opening from a fire compartment. Opening dimensions and conditions within that compartment influence the resulting plume behaviour.
Plume Entrainment & Smoke Mass Flow
Each plume type has different entrainment characteristics. Selecting an appropriate calculation method is essential to establishing a defensible smoke exhaust duty.
Selecting the Governing Fire Scenario
The governing scenario is the credible condition that controls a particular design requirement. Different scenarios may govern airflow, temperature, detection and evacuation performance.
Types of Atrium Smoke Extraction Systems
Mechanical Atrium Smoke Extraction Systems
Mechanical systems use powered fans to extract smoke through roof outlets, ducts or shafts. They offer controlled exhaust duty when supported by suitable replacement air and power.
Natural Smoke & Heat Ventilation Systems
Natural systems use buoyancy and suitably arranged vents to discharge smoke and heat. Their performance depends on temperature differences, opening geometry and external conditions.
Hybrid Natural & Mechanical Smoke Extraction
Hybrid arrangements combine natural openings and mechanical equipment within a coordinated strategy. Their interaction must be assessed so one operating mode does not undermine another.
Zoned Atrium Smoke Extraction Systems
Zoned systems divide the atrium or connected spaces into defined smoke-control areas. Detection and controls select the appropriate extraction paths for the identified fire scenario.
Smoke Reservoir & Smoke Curtain Systems
Reservoirs and curtains help collect and contain smoke where extraction is provided. They support the exhaust strategy but do not independently remove smoke.
Mall Atrium & Balcony Spill Smoke Control Systems
Shopping mall arrangements must account for retail openings, balconies and changing tenant layouts. Spill plume assessment helps establish the required containment and exhaust provision.
Multi-Level Atrium Smoke Management Systems
Multi-level systems coordinate extraction with communicating floors, circulation areas and protected escape routes. Pressure interactions and smoke exposure across levels require particular attention.
Mechanical vs Natural Atrium Smoke Extraction
Mechanical Smoke Exhaust
Powered exhaust allows designers to select a defined operating duty. Fan performance still depends on system resistance, replacement air, equipment condition and power availability.
Natural Smoke Ventilation
Natural ventilation uses appropriately sized openings and buoyancy to move smoke. Roof configuration, wind exposure and available inlet area influence whether it is suitable.
Extraction Capacity & Control
Mechanical capacity is established through fan selection and system calculations. Natural capacity is assessed using effective opening areas and the conditions driving airflow.
Building Height & Architectural Constraints
Limited roof access, enclosed façades or restricted shafts may influence system choice. Early coordination helps resolve equipment placement without compromising essential architectural or fire requirements.
When a Hybrid System Is Appropriate
A hybrid system may suit projects with useful natural openings and a need for mechanical assistance. Its benefit must be demonstrated for the intended operating scenarios.
Atrium Smoke Reservoir Design
What Is a Smoke Reservoir?
A smoke reservoir is a defined upper volume intended to collect smoke temporarily and support its removal through designated exhaust points.
Smoke Reservoir Depth
Depth must accommodate the design smoke layer while maintaining the required clearance below. It also influences exhaust inlet performance and the risk of plugholing.
Smoke Reservoir Area
Reservoir area affects available storage volume and smoke distribution. Large or irregular areas may require subdivision and multiple carefully positioned exhaust inlets.
Reservoir Boundaries
Boundaries may comprise roof features, downstands, walls or purpose-designed curtains. Their continuity and geometry must support the intended smoke containment function.
Smoke Curtains & Draft Curtains
Curtains can establish reservoir edges or guide smoke towards collection zones. Their performance classification, drop depth and installation details must match the design purpose.
Preventing Smoke Spill Between Reservoirs
Appropriate boundaries, extraction allocation and control zoning help limit unintended spill. Assessment must account for the smoke layer depth and expected operating conditions.
Atrium Smoke Curtains & Smoke Barriers
Fixed Smoke Curtains
Fixed curtains provide permanent smoke boundaries. They suit locations where the required drop can be accommodated without obstructing circulation, visibility or normal building use.
Automatic Retractable Smoke Curtains
Retractable curtains remain concealed during normal operation and deploy under specified conditions. Their controls, power-loss behaviour and deployment paths require coordinated design.
Draft Curtains
Draft curtains guide or restrict smoke movement at designated locations. The term does not automatically imply the fire-resistance performance of a compartment barrier.
Smoke Curtain Integration with Fire Alarm
Alarm interfaces trigger the required curtain response and report available status signals. Integration must include the approved response to faults and loss of power.
Smoke Curtain Location & Drop Depth
Curtain geometry is selected around the smoke reservoir, spill plume and escape routes. An arbitrary drop depth can undermine both smoke containment and usability.
Make-Up Air for Atrium Smoke Extraction
Why Make-Up Air Is Required
Extracted smoke must be replaced by incoming air. Inadequate replacement paths can restrict exhaust flow and create undesirable pressure differences across doors and adjoining areas.
Mechanical Make-Up Air
Dedicated supply fans can provide replacement air where natural openings are insufficient. Air quantity, distribution and operating sequence must be coordinated with the exhaust system.
Natural Make-Up Air Openings
Doors, louvres and purpose-designed openings may provide replacement air where accepted in the design. Their availability during a fire must be established.
Locating Make-Up Air Below the Smoke Layer
Replacement air should enter the lower region through planned paths. Intake positioning must also reduce the possibility of drawing discharged smoke back into the building.
Make-Up Air Velocity
Excessive local velocity can disturb the plume or smoke layer. Designers assess effective opening areas and airflow distribution against the adopted criteria.
Preventing Smoke Plume Disruption
High-velocity jets directed towards the fire can increase mixing and entrainment. Distributed inlets and suitable discharge directions help manage this interaction.
Balancing Exhaust & Replacement Air
Balancing considers mass flow, temperature, natural leakage and building pressure. Equal supply and exhaust volumetric rates are not automatically appropriate for hot-smoke operation.
Atrium Smoke Extraction Design Criteria
Atrium Height & Volume
Dimensions establish the physical design envelope. Clear heights, changes in section and communicating spaces must be documented before selecting the calculation approach.
Occupancy Classification
Use as an office, hotel, shopping centre or other occupancy affects the fire strategy. Mixed-use buildings require careful assessment of adjoining activities.
Design Fire Size
The design fire represents an agreed credible fire condition. It should reflect fuel arrangements, occupancy and the assumptions accepted for the project.
Heat Release Rate
Heat release rate describes the fire’s energy output over time. It influences plume flow, smoke temperature and the required extraction performance.
Fire Growth Rate
Growth rate determines how quickly the fire develops. It is important when assessing detection, system activation and the time available for evacuation.
Smoke Generation Rate
Smoke production depends on burning materials and combustion conditions. Appropriate soot assumptions are particularly important when evaluating visibility.
Required Smoke Layer Height
The target interface height must relate to occupied levels and evacuation routes. A single generic clearance cannot be applied to every atrium.
Smoke Layer Temperature
Predicted temperature influences tenability assessment and equipment selection. Thermal exposure must also be considered for ducts, dampers, supports and associated components.
Evacuation Time & Tenability
Smoke-control performance must be assessed over the required evacuation period. Visibility, heat and toxic exposure are considered together rather than independently.
Number of Connected Floors
Each communicating level can create additional smoke exposure and airflow pathways. Connections must be included in the building-wide smoke management strategy.
Building Leakage & Openings
Leakage, open doors and façade openings influence pressure and replacement air. Assumptions should reflect credible fire-mode conditions rather than idealised airtight construction.
Design Fire & Fire Scenario Analysis
Selecting the Design Fire
Selection begins with the occupancy, expected fuel packages and suppression strategy. The agreed assumptions should be documented before detailed calculations proceed.
Fire Location Within the Atrium
Location affects plume development and proximity to occupied areas. Fires near walls, beneath balconies or within temporary installations may behave differently.
Atrium Floor Fire Scenario
A floor-level fire may create a plume rising through the central atrium. Furniture, kiosks and displays should be considered where permitted by the fire strategy.
Balcony or Adjacent-Space Fire Scenario
Smoke from an adjoining compartment can flow beneath a balcony before spilling into the atrium. This can produce a significant extraction demand.
Sprinklered vs Unsprinklered Fire Conditions
Suppression assumptions influence the design fire, but sprinklers do not eliminate smoke production. Any assumed fire limitation requires an accepted engineering basis.
Worst-Case Smoke Production Scenario
The most demanding credible condition is identified through scenario comparison. The largest fire is not necessarily the only scenario governing system performance.
Atrium Smoke Extraction Rate Calculation
Air Changes per Hour Method
Where an applicable prescriptive approach uses air changes, airflow is calculated from the specified volume and rate: airflow in m³/h = design volume in m³ × ACH. The correct volume definition is essential.
Smoke Plume Mass Flow Method
This method estimates the smoke-and-air mass reaching the design layer using an appropriate plume model. Fire characteristics, plume type and rise height influence the result.
Volumetric Smoke Exhaust Calculation
Required volumetric flow is obtained from smoke mass flow and density at the design condition. Fan selection must use consistent units and temperature assumptions.
Smoke Layer Interface Method
The design examines whether extraction can maintain the target interface or adequately delay its descent. Steady and time-dependent approaches address different smoke-control objectives.
Temperature & Density Correction
Hot smoke has a different density from ambient air. Calculations must distinguish actual hot-gas volumes from reference-condition airflow figures.
Make-Up Air Calculation
Replacement-air sizing considers required mass balance, opening losses, pressure effects and permitted velocities. Natural inflow and leakage must be assessed alongside mechanical supply.
Diversity & Safety Factors
Any allowances must have a documented technical basis. Applying normal HVAC diversity assumptions to life-safety extraction can underestimate the required simultaneous duty.
Atrium Smoke Extraction Design & Sizing
Smoke Exhaust Fan Sizing
Fans are selected for the calculated airflow, pressure and thermal duty. Selection should account for the installed system rather than free-air catalogue capacity.
Number of Smoke Exhaust Fans
Fan quantity depends on extraction distribution, roof or shaft constraints and reliability requirements. Multiple fans must be assessed for their combined operating behaviour.
Fan Duty Point Selection
The selected duty point must match the system resistance at the design condition. Stable operation and available performance margins should be reviewed.
Exhaust Shaft Sizing
Shaft dimensions are coordinated with required airflow, pressure losses, construction requirements and access. Early planning helps avoid restrictive routes and expensive redesign.
Smoke Duct Sizing
Duct sizing balances available space, airflow resistance and the required smoke-control performance. The complete route includes bends, branches, fittings and discharge components.
Smoke Damper Sizing
Damper dimensions and free area influence resistance and delivered airflow. Performance classification and permitted installation arrangements are equally important.
Exhaust Grille & Intake Location
Inlets must remove smoke effectively from the reservoir. Spacing and individual extraction rates are checked to limit plugholing, where clearer air is drawn through the smoke layer.
Make-Up Air Opening Sizing
Opening size is based on effective free area and the required flow. Screens, louvres and other restrictions must be included in the assessment.
Pressure Loss Calculation
Pressure calculations include ducts, shafts, fittings, dampers, inlets and outlets. Incorrect loss estimates can leave a correctly rated fan unable to deliver the required duty.
System Redundancy
Redundancy is defined by the adopted requirements and risk assessment. It may involve fans, power supplies or control provisions and must address credible common failures.
CFD Modelling for Atrium Smoke Control
Why CFD Is Used for Complex Atriums
CFD can examine smoke movement where geometry and airflow interactions exceed the assumptions of simpler methods. It supports design evaluation when appropriately specified and reviewed.
Fire Dynamics Simulator (FDS)
FDS models fire-driven airflow and smoke transport. Its usefulness depends on appropriate input data, mesh selection and interpretation by competent fire engineering specialists.
Smoke Movement Simulation
Simulation can show predicted smoke paths through the atrium and communicating spaces. It helps identify accumulation areas, spill routes and unfavourable airflow interactions.
Smoke Layer Height Analysis
Results can be used to assess layer development and interface height over time. The interpretation method must be appropriate to the predicted flow conditions.
Temperature Distribution Analysis
Temperature assessment identifies areas of thermal exposure within the modelled scenarios. It can inform tenability evaluation and review of component design conditions.
Visibility & Tenability Analysis
Visibility predictions depend strongly on soot assumptions and the selected criteria. Assessment should focus on relevant occupant locations, routes and evacuation times.
Carbon Monoxide & Toxic Gas Assessment
Toxic exposure assessment requires justified combustion-product assumptions and suitable methods. A carbon monoxide result alone does not represent every possible fire toxicity hazard.
Make-Up Air Interaction with Smoke Plumes
Modelling can reveal plume deflection, excessive mixing or layer disturbance caused by replacement air. Findings can guide inlet relocation and distribution changes.
Multiple Fire Scenario Simulation
A scenario set tests different locations, fire developments and system conditions. One favourable simulation does not establish performance across all credible situations.
Performance-Based Fire Engineering
CFD contributes to a documented engineering assessment alongside calculations, evacuation analysis and review. Acceptance remains subject to the project’s approval process.
Atrium Smoke Extraction Fan Selection
High-Temperature Smoke Exhaust Fans
Select fans with documented suitability for the required temperature and operating duration. The installed configuration must remain consistent with the relevant performance evidence.
Axial Smoke Extract Fans
Axial fans can suit high-flow applications with compatible pressure requirements. Selection must account for duct connections, system effects and the specified smoke-duty classification.
Centrifugal Smoke Extract Fans
Centrifugal fans may suit systems requiring greater pressure capability. Arrangement, motor protection and certified operating conditions should be reviewed for the intended application.
Roof-Mounted Smoke Extract Fans
Roof-mounted units provide direct discharge where the building arrangement allows. Weather protection, structural support, maintenance access and intake separation require coordination.
Fan Temperature & Time Rating
The required rating follows the applicable code, approved strategy and design exposure. A temperature claim without its operating duration is insufficient for selection.
Duty / Standby Fan Configuration
Where standby provision is required, controls must deliver the intended changeover response. A spare fan alone does not address shared power or control failures.
Emergency Power Requirements
Emergency supply arrangements must support the designated smoke-control loads. Starting currents, transfer behaviour and simultaneous fire-system operation need electrical coordination.
Smoke Extraction Ductwork & Shafts
Fire-Rated Smoke Extract Ducts
Specified ducts must provide the performance required for their location and function. Construction, joints, supports and installation details form part of the assessed assembly.
Dedicated Smoke Exhaust Shafts
Dedicated shafts provide defined extraction routes. Their enclosure, penetrations and access arrangements must preserve the intended fire and smoke performance.
Horizontal & Vertical Smoke Duct Routing
Routing should minimise unnecessary resistance while maintaining required separation and access. Changes in direction and branch arrangements must be included in calculations.
Duct Leakage Control
Leakage can reduce effective extraction at the atrium. Suitable construction, sealing and specified testing help verify that airflow reaches the intended exhaust points.
Fire-Rated Penetration Sealing
Wall and floor penetrations need compatible fire-stopping systems. Generic sealing products should not be assumed suitable for every duct or shaft arrangement.
Access & Maintenance Requirements
Provide safe access to dampers, inspection points and maintainable components. Concealed installations without service access can create long-term operational problems.
Smoke Dampers & Control Dampers
Motorized Smoke Dampers
Motorized dampers establish the required airflow paths. Their classification, leakage performance, actuator duty and installation must suit the smoke-control function.
Fire & Smoke Dampers
Compartmentation dampers and smoke-control dampers have different duties. Selection must avoid inappropriate closure of a route that is required to exhaust smoke.
Zone Isolation Dampers
Isolation dampers help direct extraction to the intended zone. Their commanded positions must align with the active fire scenario and approved control logic.
Make-Up Air Dampers
These dampers open designated replacement-air paths. Their available free area and verified operation affect the performance of the exhaust system.
Damper Actuators & Position Feedback
Actuators must provide the required movement under specified conditions. Position feedback helps identify discrepancies between a control command and actual damper status.
Damper Fail-Safe Operation
The appropriate failure position depends on each damper’s role. Fail-open or fail-closed behaviour must be selected through the fire strategy, not applied universally.
Main Components of an Atrium Smoke Extraction System
Smoke Exhaust Fans
Smoke exhaust fans provide the mechanical force needed to remove smoke at the specified airflow, pressure and temperature conditions.
Make-Up Air Fans
Where mechanical replacement air is required, supply fans deliver air through planned routes and distribution points.
Fire-Rated Smoke Ducts
Specified smoke ducts convey extracted gases while meeting the required performance for the route and operating conditions.
Smoke Exhaust Shafts
Shafts provide vertical extraction pathways and connect the atrium exhaust network to suitable discharge locations.
Motorized Smoke Dampers
Dampers select, isolate or regulate smoke-control routes according to the approved operating sequence.
Automatic Smoke Curtains
Automatic curtains form temporary smoke boundaries where specified, supporting collection and limiting spill into adjacent areas.
Smoke & Beam Detectors
Detection devices provide alarm inputs appropriate to the atrium’s height, geometry and expected smoke behaviour.
Smoke Control Panel
The control panel coordinates system functions, indicates operating conditions and provides the required interfaces and fault reporting.
VFD Panels
Where variable frequency drives are used, their smoke-mode operation and compatibility with the fan’s approved configuration must be established.
Fire Alarm Interface
The interface communicates the required alarm, zone and control signals between detection and smoke-management systems.
Firefighter Override Controls
Dedicated controls allow authorised emergency intervention, with clear indication of equipment status and defined command priorities.
Emergency Power Supply
The designated emergency supply supports essential smoke-control operation when normal electrical power is unavailable.
Fire-Rated Cables
Required circuit survival depends on suitable cables, supports, routing, connections and protection as a complete installation.
Fire Detection for Large Atrium Spaces
Beam Smoke Detection
Beam detectors can suit large open spaces where their coverage and alignment can be maintained. Obstructions, roof movement and environmental conditions require assessment.
Aspirating Smoke Detection
Aspirating systems draw air through sampling points to a detector. Pipe layout, transport time and maintenance requirements must suit the atrium application.
Smoke Detection at Atrium Roof Level
Roof-level detection must account for ceiling geometry and access. Designers also assess whether smoke can reliably reach the detection zone.
Detection Below Projecting Floors & Balconies
Projecting structures can trap smoke beneath them. Additional detection may be needed to address these areas within the approved detection strategy.
Smoke Stratification Considerations
Temperature gradients may delay smoke reaching high-level detectors. Detection planning should consider credible stratification conditions and appropriate coverage measures.
Fire Alarm Integration
Detection inputs must activate the correct smoke-control response. Testing should verify zone identification, signal transmission and equipment operation.
Controls & Fire Alarm Integration
Automatic Smoke Extraction Activation
Automatic activation follows agreed alarm conditions and control priorities. Unnecessary delay must be avoided while maintaining the required detection logic.
Fire Detection & Alarm Inputs
Inputs may identify the fire zone and initiate specific responses. Their purpose, supervision and fault handling should be documented.
Fan Start / Stop Sequencing
Sequencing establishes suitable airflow paths before or during fan activation as designed. Fire-mode stopping and reset arrangements must also be defined.
Smoke Damper Sequencing
Dampers move to their required positions for the active scenario. The response to missing position confirmation must be specified in the control logic.
Make-Up Air Fan Sequencing
Replacement-air operation is coordinated with exhaust to avoid disruptive pressure changes. Start timing and duty are established through the approved strategy.
Smoke Curtain Deployment
Curtains deploy to designated positions while respecting escape-route requirements. Controls should address obstructions, power loss and available fault feedback.
Cause & Effect Matrix
The matrix maps initiating events to equipment actions, indications and overrides. It becomes a central reference for programming, commissioning and future maintenance.
Fan & Damper Status Monitoring
Monitoring distinguishes commands from available proof signals. Motor-running indication alone may not demonstrate that the required extraction airflow is being delivered.
Firefighter's Smoke Control Station
The station presents clear system status and authorised controls. Labelling and layout should allow responders to identify zones and understand equipment conditions.
BMS Integration
The BMS can provide monitoring where included in the design. Integration must preserve required life-safety control independence and command priorities.
Emergency Manual Override
Manual override permits defined intervention by authorised personnel. Its priority and effect on automatic operation must be explicitly documented and tested.
Atrium Smoke Extraction Cause & Effect Sequence
Fire Detection
An accepted alarm input identifies the relevant scenario and initiates the associated smoke-control commands.
HVAC Shutdown or Isolation
HVAC equipment is stopped, isolated or transferred to a designated smoke-control mode according to its role in the strategy.
Smoke Damper Activation
Selected dampers establish exhaust and replacement-air routes while isolating paths that could spread smoke.
Smoke Extraction Fan Activation
Exhaust fans operate under the required interlocks and fire-mode settings, with their specified status signals returned to the control system.
Make-Up Air Activation
Designated openings or supply fans provide replacement air in coordination with exhaust operation.
Smoke Curtain Deployment
Required curtains form the intended smoke boundaries. Deployment may occur alongside other actions rather than after fan activation.
Alarm & Status Feedback
The system displays relevant operating, fault and supervisory conditions so abnormal responses can be identified.
Firefighter Override
Authorised controls allow intervention within the approved command hierarchy. The final sequence must be verified against the project-specific matrix.
Atrium Smoke Extraction & Building HVAC Integration
Normal HVAC vs Fire Mode Operation
Comfort ventilation and smoke-control operation serve different purposes. Equipment performing both functions requires clearly defined modes and suitable performance evidence.
AHU Shutdown During Fire
AHUs that could redistribute smoke may require shutdown or isolation. Units assigned an approved smoke-control role may instead operate in a defined fire mode.
Using HVAC Systems for Smoke Control
Shared systems are acceptable only where the design and applicable requirements permit. Fans, ducts, dampers, controls and power must support the required duty.
Preventing Smoke Recirculation
The strategy must address return-air paths and outdoor intake locations. Exhaust discharge should not contaminate replacement air or occupied adjoining spaces.
Fire & Smoke Damper Coordination
Damper actions must support both compartmentation and required extraction. Conflicting commands can disable smoke removal or create unintended spread paths.
Atrium Smoke Extraction & Staircase Pressurisation
Protecting Escape Staircases
Staircase pressurisation helps resist smoke entry into protected stairs where required. Its operation must be evaluated alongside atrium exhaust and door-opening conditions.
Lobby Pressurisation
Pressurised lobbies can provide additional separation from smoke-affected areas. Pressure relationships should support access and evacuation without excessive door-opening forces.
Lift Shaft Pressurisation
Where specified, lift shaft pressurisation forms part of the building strategy. Shaft leakage and connections to lobbies require coordinated assessment.
Maintaining Building-Wide Pressure Balance
Atrium exhaust and pressurisation systems influence each other. Integrated analysis helps avoid reduced extraction, unintended airflow reversal and difficult-to-open doors.
Integrated Smoke Control Strategy
Treat atrium extraction, protected routes and communicating spaces as one coordinated system. Compress India can discuss the interfaces needed within your project scope.
Fire Safety Codes & Standards
NBC 2016 Part 4 – Atrium Smoke Control Requirements
NBC 2016 Part 4 is a key reference for fire and life safety design. Establish the provisions, amendments and local adoption conditions applicable to the project.
NBC 2016 Annex F – Atrium Requirements
Annex F addresses atrium requirements. Its provisions should be reviewed as part of the complete fire strategy rather than reduced to a single extraction figure.
Maharashtra Fire Prevention & Life Safety Measures Act
For projects in Maharashtra, confirm the applicable Act, Rules, amendments and authority procedures. Statutory obligations and required certifications must be established for the property.
Local Fire NOC Requirements
Local approval conditions can influence equipment, documentation and witness testing. Fire NOC issuance remains the responsibility of the relevant authority.
NFPA 92 – Standard for Smoke Control Systems
NFPA 92 provides a recognised framework for smoke-control design, installation and testing where adopted or accepted as part of the project basis.
EN 12101 Smoke & Heat Control Systems
Relevant EN 12101 parts address different smoke and heat control products and systems. Specify the applicable part and performance classification for each component.
Performance-Based Fire Engineering Requirements
An alternative engineering approach requires an agreed acceptance framework. Objectives, scenarios, methods and review responsibilities should be established before detailed analysis.
NBC Requirements for Atrium Smoke Extraction
Smoke Extraction Air Change Requirements
Use the applicable occupancy-specific provision and prescribed calculation volume. An air-change rate selected for another building use should not be applied automatically.
Smoke Exhaust Fan Temperature Rating
Confirm the required temperature and operating duration against the applicable provisions. Equipment submissions should demonstrate suitability for the specified duty.
Smoke Extraction Zone Height
Where the prescribed method defines an upper extraction zone, use that definition consistently. It must not be confused with the required smoke-layer interface height.
Make-Up Air Requirements
Provide a defined replacement-air strategy compatible with the applicable provisions and exhaust duty. Opening availability and airflow distribution require verification.
Emergency Power Supply
Document the required emergency supply, circuit arrangements and operating loads. Electrical design should coordinate smoke control with other essential fire systems.
Smoke Detection Requirements
Detection must suit the atrium configuration and the applicable fire alarm provisions. High ceilings and projecting floors require particular design attention.
Smoke Layer Interface Requirements
Identify the required interface and tenability criteria from the accepted design basis. Confirm their relationship to occupied floors, balconies and escape routes.
Performance-Based Atrium Smoke Control Design
When Prescriptive Design Is Not Enough
Complex geometry or unusual communicating spaces may require additional engineering assessment. Any departure from prescriptive requirements needs the relevant acceptance process.
Design Fire Scenarios
Define credible fire locations, growth assumptions and system conditions. The scenario set should address conditions that meaningfully challenge the proposed design.
Tenability Criteria
Agree assessment limits for visibility, thermal exposure and toxic effects. Criteria should reflect the occupants, evacuation routes and intended evaluation period.
Available Safe Egress Time (ASET)
ASET is the predicted time before specified conditions become untenable at relevant locations. It varies with the scenario and assessment criteria.
Required Safe Egress Time (RSET)
RSET includes detection, notification, pre-movement and travel components. Occupant behaviour and mobility assumptions must be appropriate to the building.
CFD Validation
A defensible modelling study considers model applicability, validation evidence, mesh sensitivity and input uncertainty. A simulation image alone does not validate a design.
Fire Engineer & Authority Review
The responsible fire engineer should document conclusions and limitations. Authority review and any required independent checks form part of the acceptance process.
Benefits of Atrium Smoke Extraction Systems
Maintains a Smoke-Free Evacuation Layer
A properly designed system aims to preserve a clearer lower layer for the required design period, supporting evacuation under the assessed conditions.
Controls Smoke Spread to Upper Floors
Extraction and containment can reduce smoke migration into connected levels when designed around the relevant openings and plume scenarios.
Improves Visibility During Evacuation
Limiting smoke accumulation supports route recognition and movement. Actual visibility depends on fire conditions, activation timing and system performance.
Reduces Heat & Smoke Accumulation
Removing smoke from the upper reservoir helps manage accumulated combustion products and heat within the design strategy.
Supports Firefighter Access
Managed smoke conditions and clear system controls can support emergency response, subject to the conditions encountered during the incident.
Protects Connected Escape Routes
Coordinated smoke control and protected-route systems help limit exposure along designated evacuation paths.
Supports Fire NOC Compliance
Documented design, installation and testing provide evidence for the approval process. Compliance must be assessed against the project’s applicable requirements.
Where Atrium Smoke Extraction Systems Are Used
Shopping Malls
Mall atriums require attention to retail openings, circulation balconies, kiosks and changing tenant layouts.
Commercial Office Towers
Office atriums may connect reception areas and multiple working floors, requiring coordinated extraction and protected escape arrangements.
High-Rise Buildings
Tall buildings introduce pressure effects and vertical connections that must be assessed alongside atrium smoke movement.
Hotels
Hotel atriums often connect public areas with guest circulation spaces, making detection, compartmentation and evacuation coordination important.
Airports
Large terminal spaces require smoke-control planning around extensive floor areas, high roofs and passenger circulation.
Hospitals
Healthcare buildings need strategies that account for occupants who may require assistance and the planned evacuation or relocation approach.
Convention Centres
Variable layouts and changing event occupancy require smoke-control assumptions that remain compatible with permitted uses.
Exhibition Halls
Temporary stands, displays and suspended installations can affect smoke movement and must be managed within the approved design.
Railway & Metro Stations
Connected concourses and vertical circulation spaces require coordinated treatment of smoke pathways and evacuation routes.
Mixed-Use Developments
Different occupancies sharing an atrium need a strategy addressing their distinct fire conditions and operational interfaces.
Educational & Institutional Buildings
Atriums linking teaching, circulation and gathering spaces need smoke management appropriate to occupancy and building use.
Large Public Buildings
Public buildings benefit from coordinated extraction where open internal volumes could expose several occupied levels to smoke.
Atrium Smoke Extraction Installation Guide
Smoke Extract Fan Installation
Install fans in their approved orientation with suitable support, connections and access. Verify that installation details preserve the specified performance classification.
Fire-Rated Duct Installation
Follow the assessed duct construction and support details. Substituting joints, insulation or fixing arrangements can affect the required performance.
Smoke Shaft Coordination
Confirm shaft dimensions, continuity and access before connecting equipment. Coordinate penetrations and construction details with the responsible building teams.
Smoke Damper Installation
Use the permitted installation arrangement and provide actuator access. Confirm identification, orientation and wiring against approved schedules.
Smoke Curtain Installation
Coordinate headboxes, guides and deployment paths with the finished architecture. Installation must preserve required clearance and avoid conflict with escape routes.
Make-Up Air System Installation
Install the specified fans, louvres and openings without reducing effective free area. Check for obstructions introduced by architectural finishes or security provisions.
Fire Detection Installation
Position detection equipment according to the approved layout. Provide the access and environmental conditions needed for inspection and maintenance.
Emergency Power & Fire-Rated Cabling
Install designated circuits with the specified routing, supports and protective arrangements. Coordinate essential supply connections with the electrical design.
Smoke Control Panel Installation
Locate panels where authorised operation and maintenance are practical. Provide clear labelling, appropriate environmental protection and access.
Fire Alarm Integration
Complete interfaces against the approved cause-and-effect matrix. Record signal definitions and verify end-to-end operation during commissioning.
Testing & Commissioning of Atrium Smoke Extraction Systems
Smoke Exhaust Airflow Measurement
Measure airflow using suitable methods and calibrated instruments. Compare delivered extraction at relevant points with the approved design duty.
Fan Performance Verification
Check rotation, operating speed, electrical readings and pressure conditions. Confirm that the installed fan operates consistently with the intended system duty.
Make-Up Air Measurement
Verify mechanical supply and assess designated natural inlet paths. Review distribution and local velocities where they could affect plume behaviour.
Smoke Damper Functional Testing
Command each required position and verify physical movement and feedback. Record response issues, obstructions and discrepancies.
Smoke Curtain Deployment Test
Test deployment to the specified position and review clearances. Include the required response to power loss and other defined operating conditions.
Cause & Effect Testing
Test each specified initiating event against the expected responses. Include normal operation, defined faults and manual control priorities.
Fire Alarm Interlock Testing
Verify that alarm signals activate the correct equipment and zones. Confirm relevant feedback and reset arrangements.
Emergency Power Testing
Test the approved loss-of-normal-power scenario and transfer response. Verify that required smoke-control functions operate on the designated emergency supply.
Smoke Layer & System Performance Testing
Use the agreed verification method to assess overall performance. Ambient airflow measurements alone cannot reproduce every feature of a design fire.
Hot Smoke Testing
Where specified, specialist hot smoke testing provides controlled observations of smoke behaviour and system response under an approved test procedure.
Integrated Fire-System Testing
Test smoke extraction with related alarms, HVAC controls, curtains and pressurisation systems. The objective is to identify interface conflicts.
Fire NOC Witness Testing
Prepare for required authority or consultant witnessing with agreed procedures and completed prechecks. Record observations and close identified issues.
Testing & Commissioning Reports
Provide measured results, test records, settings and outstanding actions. These documents establish a useful baseline for handover and maintenance.
Hot Smoke Testing for Atrium Smoke Control
Purpose of Hot Smoke Testing
Hot smoke testing can demonstrate aspects of smoke movement and control response. Its scope and limitations must be agreed before testing.
Smoke Movement Observation
Observers review the test smoke path and identify unexpected spread. Findings should be interpreted against the test’s thermal and geometric limitations.
Smoke Layer Formation
Testing may show how smoke collects within reservoirs. A reduced test fire does not automatically reproduce the layer formed by the design fire.
Extraction Performance Verification
Observe whether smoke reaches and leaves through intended extraction points. Use this evidence alongside airflow measurements and engineering assessment.
Make-Up Air Performance
Review whether incoming air causes visible disturbance or unwanted smoke movement. Test conditions must reflect the agreed operating configuration.
Smoke Curtain Performance
Check that deployed curtains create the intended boundaries under the test conditions and do not introduce unexpected spill paths.
Fire Authority Witness Testing
Where witnessing is required, agree the method, precautions and acceptance observations in advance. Testing must be undertaken by competent specialists.
Atrium Smoke Extraction Service, Maintenance & AMC
Scheduled Smoke Exhaust Fan Testing
Check fan condition, operation and specified proof signals at the required intervals. Maintenance should address deterioration before it affects emergency readiness.
Smoke Damper Testing
Exercise dampers and inspect actuators, obstructions and feedback. A damper left in an incorrect position can compromise the intended airflow route.
Smoke Curtain Inspection
Inspect curtain fabric, guides, deployment paths and controls. Building changes must not obstruct deployment or reduce the specified containment function.
Fire Alarm Interlock Testing
Recheck critical interfaces after maintenance, programming changes or alterations to the alarm system.
Control Panel Testing
Review indications, commands, fault reporting and control settings. Keep documentation aligned with the installed and programmed system.
Emergency Power Testing
Verify the required standby supply and transfer functions within the approved maintenance schedule and building operating procedures.
Duct & Shaft Inspection
Inspect accessible routes for damage, leakage, obstructions and unauthorised alterations that could affect extraction performance.
Airflow Performance Testing
Compare measured performance with commissioning records where required. Investigate significant changes rather than relying only on motor operation.
Annual Integrated Fire-System Testing
Where annual integrated testing is required or adopted, coordinate the affected systems and occupants. Follow any more frequent applicable inspection and testing requirements.
Fire Audit & Compliance Support
Maintain accessible records of inspections, defects and corrective work. Discuss an AMC scope with Compress India that reflects your system and building obligations.
Common Atrium Smoke Extraction Problems & Solutions
Insufficient Smoke Extraction Airflow
Check fan operation, duct resistance, leakage, damper positions and replacement-air paths. Identify the restriction before proposing a larger fan.
Smoke Layer Descending Too Low
Review the fire assumptions, effective extraction, activation time and reservoir geometry. The solution may require coordinated changes rather than additional airflow alone.
Smoke Spreading to Upper Floors
Assess communicating openings, curtain performance and smoke-layer conditions. Correct containment gaps and review the governing plume scenario.
Incorrect Make-Up Airflow
Compare the installed supply and opening areas with the design basis. Rebalance the arrangement while checking building pressure interactions.
Make-Up Air Disrupting the Smoke Plume
Review inlet location, direction and velocity. Redistribution or increased effective inlet area may resolve excessive local disturbance.
Smoke Exhaust Fan Failure
Investigate electrical supply, controls, mechanical condition and thermal suitability. Verify the required standby response where one is provided.
Smoke Damper Failure
Inspect actuators, linkages, power and control signals. Correct binding or obstructions and retest the full operating sequence.
Smoke Curtain Failure
Check deployment clearances, guides, control inputs and power arrangements. Repairs should preserve the curtain system’s specified performance.
Excessive Duct Leakage
Locate leakage and review construction details. Apply compatible repairs and repeat the specified leakage or airflow tests.
Fire Alarm Interface Failure
Trace the initiating signal through the interface and control logic. Verify programming, wiring and the intended response through an integrated test.
Poor Cause & Effect Sequencing
Compare actual operation with the approved matrix. Resolve timing conflicts, unclear priorities and missing fault responses, then repeat scenario testing.
Atrium Smoke Extraction Retrofit & Upgrades
Retrofitting Existing Atriums
Begin with a survey of installed equipment, geometry and records. Compare the current arrangement with the building’s accepted fire strategy.
Increasing Smoke Exhaust Capacity
Additional capacity requires review of ducts, shafts, intakes, power and reservoir performance. Increasing fan duty can create new problems if supporting elements remain unchanged.
Replacing Non-Compliant Smoke Exhaust Fans
Identify the required thermal duty and performance evidence before replacement. Confirm that the new fan remains compatible with the existing system resistance.
Adding Automatic Smoke Curtains
New curtains can support revised smoke containment where justified. Coordinate deployment with architecture, access and evacuation requirements.
Adding Mechanical Make-Up Air
Mechanical supply may address inadequate replacement-air paths. Assess its pressure effects and plume interaction before selecting the equipment.
Fire-Rated Duct & Shaft Upgrades
Upgrade deficient routes using suitable assessed systems and coordinated construction details. Include access, supports and penetrations in the scope.
Smoke Damper Upgrades
Replace unsuitable or unreliable dampers with components appropriate to their smoke-control role. Update controls and position feedback as required.
Fire Alarm & Control Panel Upgrades
Revised controls can improve sequencing and fault visibility. Retest all affected interfaces following programming or equipment changes.
CFD Validation of Existing Systems
A modelling study can assess a surveyed installation against agreed scenarios. Conclusions remain dependent on accurate inputs and appropriate engineering review.
Atrium Smoke Extraction System Cost in India
Atrium smoke extraction system pricing depends on the building and the required scope. A meaningful quotation needs more than floor area: geometry, design duty, extraction routes, controls and testing requirements all influence cost.
Cost by Atrium Height & Volume
Height and geometry affect equipment access, plume assessment and installation complexity. Volume alone is insufficient for reliable budgeting.
Smoke Exhaust Fan Cost
Fan cost varies with airflow, pressure, temperature-duration rating, configuration and the required performance documentation.
Smoke Duct & Shaft Cost
Route length, dimensions, construction requirements, supports and site access influence the ductwork and shaft budget.
Smoke Curtain Cost
Curtain dimensions, performance classification, guides, controls and architectural integration determine the installed scope.
Make-Up Air System Cost
Costs depend on whether replacement air uses natural openings, mechanical supply or a combination, together with the associated controls.
Fire Alarm & Control Integration Cost
Interface quantity, panel requirements, field wiring and programming complexity influence integration costs.
CFD & Fire Engineering Cost
Specialist analysis depends on geometry, scenario count, required outputs and review scope. Define deliverables before comparing proposals.
Testing & Commissioning Cost
Budget for airflow measurements, integrated testing, documentation and any specified specialist or witness testing.
Factors Affecting Total Project Cost
New-build versus retrofit conditions, working hours, access and approval requirements can materially affect the total. Share project drawings with Compress India for an itemised quotation.
Atrium Smoke Extraction Systems in Mumbai, Navi Mumbai & Thane
Discuss Atrium Smoke Extraction Systems in Mumbai, Navi Mumbai and Thane with Compress India for new developments, operational buildings and refurbishment projects. Your proposal can be scoped around site conditions, consultant requirements and the available installation programme.
For a productive initial review, share atrium plans and sections, occupancy details, the fire strategy and any existing equipment schedules. Confirm survey availability and the required design, installation or AMC scope with our team.
Why Choose Compress India for Atrium Smoke Extraction Systems?
Choose a project approach that addresses how equipment, airflow and controls work together. Compress India focuses the discussion on your building requirements, coordinated delivery and clear scope definition.
Smoke Control & HVAC Engineering Expertise
Coordinate smoke extraction with ventilation and building services from the outset. This helps identify interfaces before installation begins.
Atrium Smoke Extraction Calculations
Request a proposal based on defined geometry, duty and design assumptions. Clear calculations make equipment selection and technical review more straightforward.
Smoke Plume & Smoke Layer Analysis
Include the relevant plume scenarios and layer objectives in the design brief. This connects the extraction arrangement to the actual atrium configuration.
CFD-Based Smoke Control Design
Where specialist modelling is needed, discuss its scope, delivery arrangements and review requirements. Define the questions the study must answer before commissioning it.
Fire-Rated Equipment & Installation
Specify the required performance documentation and installation details. Component selection and site execution must support the same design intent.
Make-Up Air & Smoke Curtain Integration
Address replacement air and containment alongside exhaust sizing. These interfaces are central to effective atrium smoke management.
Fire Alarm Cause & Effect Programming
Agree operating sequences, control priorities and fault responses before programming. A clear matrix supports efficient commissioning and future maintenance.
Testing, Commissioning & Fire NOC Support
Define measurable commissioning requirements and documentation deliverables. Approval support can be scoped around the consultant’s and authority’s stated requirements.
Retrofit & AMC Support
Discuss existing-system assessments, corrective work and maintenance coverage. A defined service plan helps preserve performance as the building changes.
Get an Atrium Smoke Extraction Solution from Compress India
Plan your atrium smoke-control requirements before equipment layouts and service routes become fixed. Compress India can help you define the required scope and prepare a project-specific proposal.
Contact Compress India to request a design consultation, site assessment or quotation for Atrium Smoke Extraction Systems.
Connect with Our Smoke Control & HVAC Team
Share your project location, building use, atrium dimensions and current stage. Include whether you need a new installation, upgrade, commissioning support or AMC.
Atrium Smoke Control Design Consultation
Provide available architectural drawings, fire consultant requirements and equipment information. These inputs help establish the next engineering steps and quotation scope.
Related Smoke Management & Pressurisation Solutions
Discuss staircase pressurisation, fire lobby pressurisation, lift shaft pressurisation, multi-zone smoke control and basement smoke extraction as part of a coordinated building strategy.

Basement Smoke Exhaust Systems
Learn More
Corridor Smoke Control Systems
Learn More
Mechanical Smoke Ventilation Systems
Learn More
Natural Smoke Ventilation Systems
Learn More
Zoned Smoke Extraction Systems
Learn MoreFrequently Asked Questions
Q1: What is an atrium smoke extraction system?
An atrium smoke extraction system manages smoke within a large internal space connecting building levels. It typically combines high-level exhaust, replacement air, detection and controls, with smoke curtains or reservoirs where required.
Q2: Why is smoke extraction required in an atrium?
An atrium can allow smoke to rise and affect several floors. Dedicated smoke management helps limit accumulation and supports acceptable evacuation conditions under the approved design scenarios.
Q3: How does an atrium smoke extraction system work?
Detection initiates the specified fire-mode sequence. Exhaust removes smoke from designated collection areas, replacement air enters through planned paths, and coordinated dampers and curtains manage airflow and containment.
Q4: How is atrium smoke extraction airflow calculated?
The calculation follows the accepted design basis. It may use an applicable prescriptive air-change method, plume mass-flow calculations or a performance-based assessment, with appropriate temperature and density treatment.
Q5: How many air changes are required for atrium smoke extraction?
There is no single rate for every atrium. The applicable occupancy, code provision and prescribed calculation volume must be established; complex designs may also require plume and tenability analysis.
Q6: What is a smoke layer in an atrium?
It is the upper region where smoke accumulates. Its depth and height change as smoke enters, mixes, cools and is extracted from the atrium.
Q7: What is the minimum smoke layer height in an atrium?
The required interface height is determined from the applicable design criteria and the building’s occupied levels and escape routes. A generic height should not replace a project-specific assessment.
Q8: What is a smoke reservoir?
A smoke reservoir is a defined upper collection volume formed by roof geometry, structural boundaries or smoke curtains. It supports smoke containment and extraction.
Q9: Why is make-up air required for atrium smoke extraction?
Replacement air allows the exhaust system to achieve its intended duty. Poorly arranged make-up air can restrict extraction, disturb the smoke plume or create undesirable building pressures.
Q10: What is the difference between mechanical and natural atrium smoke extraction?
Mechanical extraction uses powered fans. Natural extraction relies on buoyancy and suitably arranged openings, with performance influenced by thermal conditions and wind. Selection depends on the building and accepted fire strategy.
Q11: What is a balcony spill plume?
It forms when smoke from an adjacent space flows beneath or across a balcony and spills into the atrium. Additional air entrainment can significantly influence the required extraction duty.
Q12: What are smoke curtains used for in atriums?
Smoke curtains help form reservoirs, guide smoke and limit spill into adjoining areas. They work with the extraction strategy and should not be assumed to provide compartment fire resistance unless specifically classified for that purpose.