Atrium Smoke Extraction Systems

(Design, Supply, Installation, Testing, Commissioning & AMC for Atrium Smoke Control Systems)

(Design, Supply, Installation, Testing, Commissioning & AMC for Atrium Smoke Control Systems)

Bring architectural openness and engineered smoke management together with Atrium Smoke Extraction Systems from Compress India. We help project teams plan smoke exhaust, replacement air, controls and system integration around the building’s layout and approved fire strategy.

Whether you are developing a shopping mall, hotel, commercial tower or public building, contact Compress India for a project-specific assessment and quotation.

Atrium Smoke Extraction Systems

A dependable atrium smoke control system requires coordinated engineering from initial calculations through operational testing. Compress India provides a project delivery approach covering equipment selection, installation, commissioning and maintenance, with specialist analysis and approval support defined to suit your scope.

Share your architectural drawings, fire consultant’s requirements and project schedule to discuss a suitable solution.

What Is an Atrium Smoke Extraction System?

An atrium smoke extraction system removes smoke from a large internal space connecting multiple building levels. Typically, high-level extraction works with low-level make-up air, smoke reservoirs, detection and automatic controls to manage smoke movement during a fire.

Its purpose is to support acceptable evacuation conditions for the design period and limit smoke spread into connected areas. The system forms part of the wider fire safety strategy alongside compartmentation, suppression, alarms and protected escape routes.

Why Atriums Need Dedicated Smoke Extraction

Rapid Vertical Smoke Movement in Tall Open Spaces

An open atrium can provide a vertical path for rising smoke. Dedicated smoke extraction helps manage this movement before smoke compromises connected floors and circulation areas.

Smoke Accumulation Beneath Atrium Roofs

Smoke reaching the upper atrium can accumulate beneath the roof and form a descending layer. High-level exhaust removes smoke from this collection zone.

Smoke Spread to Connected Floors & Balconies

Open balconies and communicating floors can be exposed as smoke spreads. Extraction, smoke barriers and appropriate separation must work together to address these pathways.

Maintaining a Tenable Smoke-Free Layer

The design aims to preserve a sufficiently clear lower layer for the required period. Assessment considers visibility, temperature and exposure to harmful combustion products.

Protecting Escape Routes & Occupied Floors

Smoke management supports evacuation by limiting smoke exposure along designated routes. Its effectiveness depends on the building layout, fire scenario and coordination with protected exits.

Supporting Firefighting & Rescue Operations

Controlled smoke movement can improve access and operating conditions for emergency responders. Firefighter controls allow intervention according to the approved system strategy.

Fire NOC & Building Code Compliance

A documented smoke-control design supports fire approval submissions and inspections. Applicable requirements and acceptance conditions must be established with the project consultant and relevant authority.

How an Atrium Smoke Extraction System Works

1. Fire & Smoke Are Detected

The fire detection system identifies an alarm condition and sends the required inputs to the smoke-control system according to the approved cause-and-effect matrix.

2. Hot Smoke Rises Through the Atrium

Buoyant smoke rises while drawing surrounding air into the plume. Fire size, ceiling height and architectural obstructions influence its movement and volume.

3. Smoke Collects Within the Smoke Reservoir

The roof geometry and designated reservoir boundaries provide a collection region. Where specified, smoke curtains help contain smoke within the intended extraction area.

4. Atrium Smoke Exhaust Fans Start Automatically

Fans start through a controlled sequence that establishes the required extraction path. Damper status, electrical availability and relevant interlocks are incorporated into the design.

5. Smoke Is Extracted at High Level

Exhaust inlets remove smoke from the upper layer and discharge it outdoors. Discharge locations must avoid exposing escape routes, neighbouring openings and replacement-air intakes.

6. Make-Up Air Enters Below the Smoke Layer

Replacement air enters through planned openings or mechanical supply systems. Its distribution must support exhaust operation without significantly disturbing the smoke plume.

7. Smoke Curtains & Barriers Control Smoke Spread

Specified curtains and barriers channel or contain smoke within designated areas. Their positions and deployment must remain compatible with evacuation and the overall fire strategy.

8. Fire Alarm & Smoke Control Panels Coordinate the System

Control panels manage fans, dampers, curtains and feedback signals. The precise operating sequence is project-specific; these functions may overlap rather than occur as eight separate stages.

Understanding Smoke Behaviour in an Atrium

Smoke Buoyancy & Thermal Plumes

Smoke generally rises because heated gases are less dense than surrounding air. As the plume entrains cooler air, its temperature and buoyancy change.

Smoke Layer Formation

Smoke accumulating above the occupied zone forms an upper layer. Its depth changes with smoke inflow, extraction performance, heat losses and the available reservoir volume.

Smoke Layer Interface Height

The interface describes the transition between the upper smoke layer and clearer air below. Maintaining its design height is an important smoke-control objective.

Smoke Stratification in Tall Atriums

A plume may lose buoyancy before reaching roof level, particularly where temperature gradients exist. This can affect both smoke detection and the assumed extraction behaviour.

Entrainment of Air into the Smoke Plume

Rising smoke draws in surrounding air, increasing the mass that must be managed. Extraction sizing therefore considers plume behaviour, not simply the initial combustion products.

Effect of Atrium Height & Geometry

Height, roof shape, changes in cross-section and internal obstructions affect smoke movement. Two atriums with similar volumes may require different extraction arrangements.

Effect of Balconies, Openings & Connected Floors

Balcony edges and adjacent openings can redirect smoke and create spill plumes. These features must be represented in the design calculations and scenario assessment.

Types of Smoke Plumes in Atrium Design

Axisymmetric Smoke Plume

An axisymmetric plume is associated with a fire rising relatively freely away from walls and major obstructions. Its applicability depends on the actual fire location.

Balcony Spill Plume

A balcony spill plume forms when smoke flows from an adjacent space and spills over an edge into the atrium, entraining additional air as it rises.

Window Plume

A window plume emerges through a vertical opening from a fire compartment. Opening dimensions and conditions within that compartment influence the resulting plume behaviour.

Plume Entrainment & Smoke Mass Flow

Each plume type has different entrainment characteristics. Selecting an appropriate calculation method is essential to establishing a defensible smoke exhaust duty.

Selecting the Governing Fire Scenario

The governing scenario is the credible condition that controls a particular design requirement. Different scenarios may govern airflow, temperature, detection and evacuation performance.

Types of Atrium Smoke Extraction Systems

Mechanical Atrium Smoke Extraction Systems

Mechanical systems use powered fans to extract smoke through roof outlets, ducts or shafts. They offer controlled exhaust duty when supported by suitable replacement air and power.

Natural Smoke & Heat Ventilation Systems

Natural systems use buoyancy and suitably arranged vents to discharge smoke and heat. Their performance depends on temperature differences, opening geometry and external conditions.

Hybrid Natural & Mechanical Smoke Extraction

Hybrid arrangements combine natural openings and mechanical equipment within a coordinated strategy. Their interaction must be assessed so one operating mode does not undermine another.

Zoned Atrium Smoke Extraction Systems

Zoned systems divide the atrium or connected spaces into defined smoke-control areas. Detection and controls select the appropriate extraction paths for the identified fire scenario.

Smoke Reservoir & Smoke Curtain Systems

Reservoirs and curtains help collect and contain smoke where extraction is provided. They support the exhaust strategy but do not independently remove smoke.

Mall Atrium & Balcony Spill Smoke Control Systems

Shopping mall arrangements must account for retail openings, balconies and changing tenant layouts. Spill plume assessment helps establish the required containment and exhaust provision.

Multi-Level Atrium Smoke Management Systems

Multi-level systems coordinate extraction with communicating floors, circulation areas and protected escape routes. Pressure interactions and smoke exposure across levels require particular attention.

Mechanical vs Natural Atrium Smoke Extraction

Mechanical Smoke Exhaust

Powered exhaust allows designers to select a defined operating duty. Fan performance still depends on system resistance, replacement air, equipment condition and power availability.

Natural Smoke Ventilation

Natural ventilation uses appropriately sized openings and buoyancy to move smoke. Roof configuration, wind exposure and available inlet area influence whether it is suitable.

Extraction Capacity & Control

Mechanical capacity is established through fan selection and system calculations. Natural capacity is assessed using effective opening areas and the conditions driving airflow.

Building Height & Architectural Constraints

Limited roof access, enclosed façades or restricted shafts may influence system choice. Early coordination helps resolve equipment placement without compromising essential architectural or fire requirements.

When a Hybrid System Is Appropriate

A hybrid system may suit projects with useful natural openings and a need for mechanical assistance. Its benefit must be demonstrated for the intended operating scenarios.

Atrium Smoke Reservoir Design

What Is a Smoke Reservoir?

A smoke reservoir is a defined upper volume intended to collect smoke temporarily and support its removal through designated exhaust points.

Smoke Reservoir Depth

Depth must accommodate the design smoke layer while maintaining the required clearance below. It also influences exhaust inlet performance and the risk of plugholing.

Smoke Reservoir Area

Reservoir area affects available storage volume and smoke distribution. Large or irregular areas may require subdivision and multiple carefully positioned exhaust inlets.

Reservoir Boundaries

Boundaries may comprise roof features, downstands, walls or purpose-designed curtains. Their continuity and geometry must support the intended smoke containment function.

Smoke Curtains & Draft Curtains

Curtains can establish reservoir edges or guide smoke towards collection zones. Their performance classification, drop depth and installation details must match the design purpose.

Preventing Smoke Spill Between Reservoirs

Appropriate boundaries, extraction allocation and control zoning help limit unintended spill. Assessment must account for the smoke layer depth and expected operating conditions.

Atrium Smoke Curtains & Smoke Barriers

Fixed Smoke Curtains

Fixed curtains provide permanent smoke boundaries. They suit locations where the required drop can be accommodated without obstructing circulation, visibility or normal building use.

Automatic Retractable Smoke Curtains

Retractable curtains remain concealed during normal operation and deploy under specified conditions. Their controls, power-loss behaviour and deployment paths require coordinated design.

Draft Curtains

Draft curtains guide or restrict smoke movement at designated locations. The term does not automatically imply the fire-resistance performance of a compartment barrier.

Smoke Curtain Integration with Fire Alarm

Alarm interfaces trigger the required curtain response and report available status signals. Integration must include the approved response to faults and loss of power.

Smoke Curtain Location & Drop Depth

Curtain geometry is selected around the smoke reservoir, spill plume and escape routes. An arbitrary drop depth can undermine both smoke containment and usability.

Make-Up Air for Atrium Smoke Extraction

Why Make-Up Air Is Required

Extracted smoke must be replaced by incoming air. Inadequate replacement paths can restrict exhaust flow and create undesirable pressure differences across doors and adjoining areas.

Mechanical Make-Up Air

Dedicated supply fans can provide replacement air where natural openings are insufficient. Air quantity, distribution and operating sequence must be coordinated with the exhaust system.

Natural Make-Up Air Openings

Doors, louvres and purpose-designed openings may provide replacement air where accepted in the design. Their availability during a fire must be established.

Locating Make-Up Air Below the Smoke Layer

Replacement air should enter the lower region through planned paths. Intake positioning must also reduce the possibility of drawing discharged smoke back into the building.

Make-Up Air Velocity

Excessive local velocity can disturb the plume or smoke layer. Designers assess effective opening areas and airflow distribution against the adopted criteria.

Preventing Smoke Plume Disruption

High-velocity jets directed towards the fire can increase mixing and entrainment. Distributed inlets and suitable discharge directions help manage this interaction.

Balancing Exhaust & Replacement Air

Balancing considers mass flow, temperature, natural leakage and building pressure. Equal supply and exhaust volumetric rates are not automatically appropriate for hot-smoke operation.

Atrium Smoke Extraction Design Criteria

Atrium Height & Volume

Dimensions establish the physical design envelope. Clear heights, changes in section and communicating spaces must be documented before selecting the calculation approach.

Occupancy Classification

Use as an office, hotel, shopping centre or other occupancy affects the fire strategy. Mixed-use buildings require careful assessment of adjoining activities.

Design Fire Size

The design fire represents an agreed credible fire condition. It should reflect fuel arrangements, occupancy and the assumptions accepted for the project.

Heat Release Rate

Heat release rate describes the fire’s energy output over time. It influences plume flow, smoke temperature and the required extraction performance.

Fire Growth Rate

Growth rate determines how quickly the fire develops. It is important when assessing detection, system activation and the time available for evacuation.

Smoke Generation Rate

Smoke production depends on burning materials and combustion conditions. Appropriate soot assumptions are particularly important when evaluating visibility.

Required Smoke Layer Height

The target interface height must relate to occupied levels and evacuation routes. A single generic clearance cannot be applied to every atrium.

Smoke Layer Temperature

Predicted temperature influences tenability assessment and equipment selection. Thermal exposure must also be considered for ducts, dampers, supports and associated components.

Evacuation Time & Tenability

Smoke-control performance must be assessed over the required evacuation period. Visibility, heat and toxic exposure are considered together rather than independently.

Number of Connected Floors

Each communicating level can create additional smoke exposure and airflow pathways. Connections must be included in the building-wide smoke management strategy.

Building Leakage & Openings

Leakage, open doors and façade openings influence pressure and replacement air. Assumptions should reflect credible fire-mode conditions rather than idealised airtight construction.

Design Fire & Fire Scenario Analysis

Selecting the Design Fire

Selection begins with the occupancy, expected fuel packages and suppression strategy. The agreed assumptions should be documented before detailed calculations proceed.

Fire Location Within the Atrium

Location affects plume development and proximity to occupied areas. Fires near walls, beneath balconies or within temporary installations may behave differently.

Atrium Floor Fire Scenario

A floor-level fire may create a plume rising through the central atrium. Furniture, kiosks and displays should be considered where permitted by the fire strategy.

Balcony or Adjacent-Space Fire Scenario

Smoke from an adjoining compartment can flow beneath a balcony before spilling into the atrium. This can produce a significant extraction demand.

Sprinklered vs Unsprinklered Fire Conditions

Suppression assumptions influence the design fire, but sprinklers do not eliminate smoke production. Any assumed fire limitation requires an accepted engineering basis.

Worst-Case Smoke Production Scenario

The most demanding credible condition is identified through scenario comparison. The largest fire is not necessarily the only scenario governing system performance.

Atrium Smoke Extraction Rate Calculation

Air Changes per Hour Method

Where an applicable prescriptive approach uses air changes, airflow is calculated from the specified volume and rate: airflow in m³/h = design volume in m³ × ACH. The correct volume definition is essential.

Smoke Plume Mass Flow Method

This method estimates the smoke-and-air mass reaching the design layer using an appropriate plume model. Fire characteristics, plume type and rise height influence the result.

Volumetric Smoke Exhaust Calculation

Required volumetric flow is obtained from smoke mass flow and density at the design condition. Fan selection must use consistent units and temperature assumptions.

Smoke Layer Interface Method

The design examines whether extraction can maintain the target interface or adequately delay its descent. Steady and time-dependent approaches address different smoke-control objectives.

Temperature & Density Correction

Hot smoke has a different density from ambient air. Calculations must distinguish actual hot-gas volumes from reference-condition airflow figures.

Make-Up Air Calculation

Replacement-air sizing considers required mass balance, opening losses, pressure effects and permitted velocities. Natural inflow and leakage must be assessed alongside mechanical supply.

Diversity & Safety Factors

Any allowances must have a documented technical basis. Applying normal HVAC diversity assumptions to life-safety extraction can underestimate the required simultaneous duty.

Atrium Smoke Extraction Design & Sizing

Smoke Exhaust Fan Sizing

Fans are selected for the calculated airflow, pressure and thermal duty. Selection should account for the installed system rather than free-air catalogue capacity.

Number of Smoke Exhaust Fans

Fan quantity depends on extraction distribution, roof or shaft constraints and reliability requirements. Multiple fans must be assessed for their combined operating behaviour.

Fan Duty Point Selection

The selected duty point must match the system resistance at the design condition. Stable operation and available performance margins should be reviewed.

Exhaust Shaft Sizing

Shaft dimensions are coordinated with required airflow, pressure losses, construction requirements and access. Early planning helps avoid restrictive routes and expensive redesign.

Smoke Duct Sizing

Duct sizing balances available space, airflow resistance and the required smoke-control performance. The complete route includes bends, branches, fittings and discharge components.

Smoke Damper Sizing

Damper dimensions and free area influence resistance and delivered airflow. Performance classification and permitted installation arrangements are equally important.

Exhaust Grille & Intake Location

Inlets must remove smoke effectively from the reservoir. Spacing and individual extraction rates are checked to limit plugholing, where clearer air is drawn through the smoke layer.

Make-Up Air Opening Sizing

Opening size is based on effective free area and the required flow. Screens, louvres and other restrictions must be included in the assessment.

Pressure Loss Calculation

Pressure calculations include ducts, shafts, fittings, dampers, inlets and outlets. Incorrect loss estimates can leave a correctly rated fan unable to deliver the required duty.

System Redundancy

Redundancy is defined by the adopted requirements and risk assessment. It may involve fans, power supplies or control provisions and must address credible common failures.

CFD Modelling for Atrium Smoke Control

Why CFD Is Used for Complex Atriums

CFD can examine smoke movement where geometry and airflow interactions exceed the assumptions of simpler methods. It supports design evaluation when appropriately specified and reviewed.

Fire Dynamics Simulator (FDS)

FDS models fire-driven airflow and smoke transport. Its usefulness depends on appropriate input data, mesh selection and interpretation by competent fire engineering specialists.

Smoke Movement Simulation

Simulation can show predicted smoke paths through the atrium and communicating spaces. It helps identify accumulation areas, spill routes and unfavourable airflow interactions.

Smoke Layer Height Analysis

Results can be used to assess layer development and interface height over time. The interpretation method must be appropriate to the predicted flow conditions.

Temperature Distribution Analysis

Temperature assessment identifies areas of thermal exposure within the modelled scenarios. It can inform tenability evaluation and review of component design conditions.

Visibility & Tenability Analysis

Visibility predictions depend strongly on soot assumptions and the selected criteria. Assessment should focus on relevant occupant locations, routes and evacuation times.

Carbon Monoxide & Toxic Gas Assessment

Toxic exposure assessment requires justified combustion-product assumptions and suitable methods. A carbon monoxide result alone does not represent every possible fire toxicity hazard.

Make-Up Air Interaction with Smoke Plumes

Modelling can reveal plume deflection, excessive mixing or layer disturbance caused by replacement air. Findings can guide inlet relocation and distribution changes.

Multiple Fire Scenario Simulation

A scenario set tests different locations, fire developments and system conditions. One favourable simulation does not establish performance across all credible situations.

Performance-Based Fire Engineering

CFD contributes to a documented engineering assessment alongside calculations, evacuation analysis and review. Acceptance remains subject to the project’s approval process.

Atrium Smoke Extraction Fan Selection

High-Temperature Smoke Exhaust Fans

Select fans with documented suitability for the required temperature and operating duration. The installed configuration must remain consistent with the relevant performance evidence.

Axial Smoke Extract Fans

Axial fans can suit high-flow applications with compatible pressure requirements. Selection must account for duct connections, system effects and the specified smoke-duty classification.

Centrifugal Smoke Extract Fans

Centrifugal fans may suit systems requiring greater pressure capability. Arrangement, motor protection and certified operating conditions should be reviewed for the intended application.

Roof-Mounted Smoke Extract Fans

Roof-mounted units provide direct discharge where the building arrangement allows. Weather protection, structural support, maintenance access and intake separation require coordination.

Fan Temperature & Time Rating

The required rating follows the applicable code, approved strategy and design exposure. A temperature claim without its operating duration is insufficient for selection.

Duty / Standby Fan Configuration

Where standby provision is required, controls must deliver the intended changeover response. A spare fan alone does not address shared power or control failures.

Emergency Power Requirements

Emergency supply arrangements must support the designated smoke-control loads. Starting currents, transfer behaviour and simultaneous fire-system operation need electrical coordination.

Smoke Extraction Ductwork & Shafts

Fire-Rated Smoke Extract Ducts

Specified ducts must provide the performance required for their location and function. Construction, joints, supports and installation details form part of the assessed assembly.

Dedicated Smoke Exhaust Shafts

Dedicated shafts provide defined extraction routes. Their enclosure, penetrations and access arrangements must preserve the intended fire and smoke performance.

Horizontal & Vertical Smoke Duct Routing

Routing should minimise unnecessary resistance while maintaining required separation and access. Changes in direction and branch arrangements must be included in calculations.

Duct Leakage Control

Leakage can reduce effective extraction at the atrium. Suitable construction, sealing and specified testing help verify that airflow reaches the intended exhaust points.

Fire-Rated Penetration Sealing

Wall and floor penetrations need compatible fire-stopping systems. Generic sealing products should not be assumed suitable for every duct or shaft arrangement.

Access & Maintenance Requirements

Provide safe access to dampers, inspection points and maintainable components. Concealed installations without service access can create long-term operational problems.

Smoke Dampers & Control Dampers

Motorized Smoke Dampers

Motorized dampers establish the required airflow paths. Their classification, leakage performance, actuator duty and installation must suit the smoke-control function.

Fire & Smoke Dampers

Compartmentation dampers and smoke-control dampers have different duties. Selection must avoid inappropriate closure of a route that is required to exhaust smoke.

Zone Isolation Dampers

Isolation dampers help direct extraction to the intended zone. Their commanded positions must align with the active fire scenario and approved control logic.

Make-Up Air Dampers

These dampers open designated replacement-air paths. Their available free area and verified operation affect the performance of the exhaust system.

Damper Actuators & Position Feedback

Actuators must provide the required movement under specified conditions. Position feedback helps identify discrepancies between a control command and actual damper status.

Damper Fail-Safe Operation

The appropriate failure position depends on each damper’s role. Fail-open or fail-closed behaviour must be selected through the fire strategy, not applied universally.

Main Components of an Atrium Smoke Extraction System

Smoke Exhaust Fans

Smoke exhaust fans provide the mechanical force needed to remove smoke at the specified airflow, pressure and temperature conditions.

Make-Up Air Fans

Where mechanical replacement air is required, supply fans deliver air through planned routes and distribution points.

Fire-Rated Smoke Ducts

Specified smoke ducts convey extracted gases while meeting the required performance for the route and operating conditions.

Smoke Exhaust Shafts

Shafts provide vertical extraction pathways and connect the atrium exhaust network to suitable discharge locations.

Motorized Smoke Dampers

Dampers select, isolate or regulate smoke-control routes according to the approved operating sequence.

Automatic Smoke Curtains

Automatic curtains form temporary smoke boundaries where specified, supporting collection and limiting spill into adjacent areas.

Smoke & Beam Detectors

Detection devices provide alarm inputs appropriate to the atrium’s height, geometry and expected smoke behaviour.

Smoke Control Panel

The control panel coordinates system functions, indicates operating conditions and provides the required interfaces and fault reporting.

VFD Panels

Where variable frequency drives are used, their smoke-mode operation and compatibility with the fan’s approved configuration must be established.

Fire Alarm Interface

The interface communicates the required alarm, zone and control signals between detection and smoke-management systems.

Firefighter Override Controls

Dedicated controls allow authorised emergency intervention, with clear indication of equipment status and defined command priorities.

Emergency Power Supply

The designated emergency supply supports essential smoke-control operation when normal electrical power is unavailable.

Fire-Rated Cables

Required circuit survival depends on suitable cables, supports, routing, connections and protection as a complete installation.

Fire Detection for Large Atrium Spaces

Beam Smoke Detection

Beam detectors can suit large open spaces where their coverage and alignment can be maintained. Obstructions, roof movement and environmental conditions require assessment.

Aspirating Smoke Detection

Aspirating systems draw air through sampling points to a detector. Pipe layout, transport time and maintenance requirements must suit the atrium application.

Smoke Detection at Atrium Roof Level

Roof-level detection must account for ceiling geometry and access. Designers also assess whether smoke can reliably reach the detection zone.

Detection Below Projecting Floors & Balconies

Projecting structures can trap smoke beneath them. Additional detection may be needed to address these areas within the approved detection strategy.

Smoke Stratification Considerations

Temperature gradients may delay smoke reaching high-level detectors. Detection planning should consider credible stratification conditions and appropriate coverage measures.

Fire Alarm Integration

Detection inputs must activate the correct smoke-control response. Testing should verify zone identification, signal transmission and equipment operation.

Controls & Fire Alarm Integration

Automatic Smoke Extraction Activation

Automatic activation follows agreed alarm conditions and control priorities. Unnecessary delay must be avoided while maintaining the required detection logic.

Fire Detection & Alarm Inputs

Inputs may identify the fire zone and initiate specific responses. Their purpose, supervision and fault handling should be documented.

Fan Start / Stop Sequencing

Sequencing establishes suitable airflow paths before or during fan activation as designed. Fire-mode stopping and reset arrangements must also be defined.

Smoke Damper Sequencing

Dampers move to their required positions for the active scenario. The response to missing position confirmation must be specified in the control logic.

Make-Up Air Fan Sequencing

Replacement-air operation is coordinated with exhaust to avoid disruptive pressure changes. Start timing and duty are established through the approved strategy.

Smoke Curtain Deployment

Curtains deploy to designated positions while respecting escape-route requirements. Controls should address obstructions, power loss and available fault feedback.

Cause & Effect Matrix

The matrix maps initiating events to equipment actions, indications and overrides. It becomes a central reference for programming, commissioning and future maintenance.

Fan & Damper Status Monitoring

Monitoring distinguishes commands from available proof signals. Motor-running indication alone may not demonstrate that the required extraction airflow is being delivered.

Firefighter's Smoke Control Station

The station presents clear system status and authorised controls. Labelling and layout should allow responders to identify zones and understand equipment conditions.

BMS Integration

The BMS can provide monitoring where included in the design. Integration must preserve required life-safety control independence and command priorities.

Emergency Manual Override

Manual override permits defined intervention by authorised personnel. Its priority and effect on automatic operation must be explicitly documented and tested.

Atrium Smoke Extraction Cause & Effect Sequence

Fire Detection

An accepted alarm input identifies the relevant scenario and initiates the associated smoke-control commands.

HVAC Shutdown or Isolation

HVAC equipment is stopped, isolated or transferred to a designated smoke-control mode according to its role in the strategy.

Smoke Damper Activation

Selected dampers establish exhaust and replacement-air routes while isolating paths that could spread smoke.

Smoke Extraction Fan Activation

Exhaust fans operate under the required interlocks and fire-mode settings, with their specified status signals returned to the control system.

Make-Up Air Activation

Designated openings or supply fans provide replacement air in coordination with exhaust operation.

Smoke Curtain Deployment

Required curtains form the intended smoke boundaries. Deployment may occur alongside other actions rather than after fan activation.

Alarm & Status Feedback

The system displays relevant operating, fault and supervisory conditions so abnormal responses can be identified.

Firefighter Override

Authorised controls allow intervention within the approved command hierarchy. The final sequence must be verified against the project-specific matrix.

Atrium Smoke Extraction & Building HVAC Integration

Normal HVAC vs Fire Mode Operation

Comfort ventilation and smoke-control operation serve different purposes. Equipment performing both functions requires clearly defined modes and suitable performance evidence.

AHU Shutdown During Fire

AHUs that could redistribute smoke may require shutdown or isolation. Units assigned an approved smoke-control role may instead operate in a defined fire mode.

Using HVAC Systems for Smoke Control

Shared systems are acceptable only where the design and applicable requirements permit. Fans, ducts, dampers, controls and power must support the required duty.

Preventing Smoke Recirculation

The strategy must address return-air paths and outdoor intake locations. Exhaust discharge should not contaminate replacement air or occupied adjoining spaces.

Fire & Smoke Damper Coordination

Damper actions must support both compartmentation and required extraction. Conflicting commands can disable smoke removal or create unintended spread paths.

Atrium Smoke Extraction & Staircase Pressurisation

Protecting Escape Staircases

Staircase pressurisation helps resist smoke entry into protected stairs where required. Its operation must be evaluated alongside atrium exhaust and door-opening conditions.

Lobby Pressurisation

Pressurised lobbies can provide additional separation from smoke-affected areas. Pressure relationships should support access and evacuation without excessive door-opening forces.

Lift Shaft Pressurisation

Where specified, lift shaft pressurisation forms part of the building strategy. Shaft leakage and connections to lobbies require coordinated assessment.

Maintaining Building-Wide Pressure Balance

Atrium exhaust and pressurisation systems influence each other. Integrated analysis helps avoid reduced extraction, unintended airflow reversal and difficult-to-open doors.

Integrated Smoke Control Strategy

Treat atrium extraction, protected routes and communicating spaces as one coordinated system. Compress India can discuss the interfaces needed within your project scope.

Fire Safety Codes & Standards

NBC 2016 Part 4 – Atrium Smoke Control Requirements

NBC 2016 Part 4 is a key reference for fire and life safety design. Establish the provisions, amendments and local adoption conditions applicable to the project.

NBC 2016 Annex F – Atrium Requirements

Annex F addresses atrium requirements. Its provisions should be reviewed as part of the complete fire strategy rather than reduced to a single extraction figure.

Maharashtra Fire Prevention & Life Safety Measures Act

For projects in Maharashtra, confirm the applicable Act, Rules, amendments and authority procedures. Statutory obligations and required certifications must be established for the property.

Local Fire NOC Requirements

Local approval conditions can influence equipment, documentation and witness testing. Fire NOC issuance remains the responsibility of the relevant authority.

NFPA 92 – Standard for Smoke Control Systems

NFPA 92 provides a recognised framework for smoke-control design, installation and testing where adopted or accepted as part of the project basis.

EN 12101 Smoke & Heat Control Systems

Relevant EN 12101 parts address different smoke and heat control products and systems. Specify the applicable part and performance classification for each component.

Performance-Based Fire Engineering Requirements

An alternative engineering approach requires an agreed acceptance framework. Objectives, scenarios, methods and review responsibilities should be established before detailed analysis.

NBC Requirements for Atrium Smoke Extraction

Smoke Extraction Air Change Requirements

Use the applicable occupancy-specific provision and prescribed calculation volume. An air-change rate selected for another building use should not be applied automatically.

Smoke Exhaust Fan Temperature Rating

Confirm the required temperature and operating duration against the applicable provisions. Equipment submissions should demonstrate suitability for the specified duty.

Smoke Extraction Zone Height

Where the prescribed method defines an upper extraction zone, use that definition consistently. It must not be confused with the required smoke-layer interface height.

Make-Up Air Requirements

Provide a defined replacement-air strategy compatible with the applicable provisions and exhaust duty. Opening availability and airflow distribution require verification.

Emergency Power Supply

Document the required emergency supply, circuit arrangements and operating loads. Electrical design should coordinate smoke control with other essential fire systems.

Smoke Detection Requirements

Detection must suit the atrium configuration and the applicable fire alarm provisions. High ceilings and projecting floors require particular design attention.

Smoke Layer Interface Requirements

Identify the required interface and tenability criteria from the accepted design basis. Confirm their relationship to occupied floors, balconies and escape routes.

Performance-Based Atrium Smoke Control Design

When Prescriptive Design Is Not Enough

Complex geometry or unusual communicating spaces may require additional engineering assessment. Any departure from prescriptive requirements needs the relevant acceptance process.

Design Fire Scenarios

Define credible fire locations, growth assumptions and system conditions. The scenario set should address conditions that meaningfully challenge the proposed design.

Tenability Criteria

Agree assessment limits for visibility, thermal exposure and toxic effects. Criteria should reflect the occupants, evacuation routes and intended evaluation period.

Available Safe Egress Time (ASET)

ASET is the predicted time before specified conditions become untenable at relevant locations. It varies with the scenario and assessment criteria.

Required Safe Egress Time (RSET)

RSET includes detection, notification, pre-movement and travel components. Occupant behaviour and mobility assumptions must be appropriate to the building.

CFD Validation

A defensible modelling study considers model applicability, validation evidence, mesh sensitivity and input uncertainty. A simulation image alone does not validate a design.

Fire Engineer & Authority Review

The responsible fire engineer should document conclusions and limitations. Authority review and any required independent checks form part of the acceptance process.

Benefits of Atrium Smoke Extraction Systems

Maintains a Smoke-Free Evacuation Layer

A properly designed system aims to preserve a clearer lower layer for the required design period, supporting evacuation under the assessed conditions.

Controls Smoke Spread to Upper Floors

Extraction and containment can reduce smoke migration into connected levels when designed around the relevant openings and plume scenarios.

Improves Visibility During Evacuation

Limiting smoke accumulation supports route recognition and movement. Actual visibility depends on fire conditions, activation timing and system performance.

Reduces Heat & Smoke Accumulation

Removing smoke from the upper reservoir helps manage accumulated combustion products and heat within the design strategy.

Supports Firefighter Access

Managed smoke conditions and clear system controls can support emergency response, subject to the conditions encountered during the incident.

Protects Connected Escape Routes

Coordinated smoke control and protected-route systems help limit exposure along designated evacuation paths.

Supports Fire NOC Compliance

Documented design, installation and testing provide evidence for the approval process. Compliance must be assessed against the project’s applicable requirements.

Where Atrium Smoke Extraction Systems Are Used

Shopping Malls

Mall atriums require attention to retail openings, circulation balconies, kiosks and changing tenant layouts.

Commercial Office Towers

Office atriums may connect reception areas and multiple working floors, requiring coordinated extraction and protected escape arrangements.

High-Rise Buildings

Tall buildings introduce pressure effects and vertical connections that must be assessed alongside atrium smoke movement.

Hotels

Hotel atriums often connect public areas with guest circulation spaces, making detection, compartmentation and evacuation coordination important.

Airports

Large terminal spaces require smoke-control planning around extensive floor areas, high roofs and passenger circulation.

Hospitals

Healthcare buildings need strategies that account for occupants who may require assistance and the planned evacuation or relocation approach.

Convention Centres

Variable layouts and changing event occupancy require smoke-control assumptions that remain compatible with permitted uses.

Exhibition Halls

Temporary stands, displays and suspended installations can affect smoke movement and must be managed within the approved design.

Railway & Metro Stations

Connected concourses and vertical circulation spaces require coordinated treatment of smoke pathways and evacuation routes.

Mixed-Use Developments

Different occupancies sharing an atrium need a strategy addressing their distinct fire conditions and operational interfaces.

Educational & Institutional Buildings

Atriums linking teaching, circulation and gathering spaces need smoke management appropriate to occupancy and building use.

Large Public Buildings

Public buildings benefit from coordinated extraction where open internal volumes could expose several occupied levels to smoke.

Atrium Smoke Extraction Installation Guide

Smoke Extract Fan Installation

Install fans in their approved orientation with suitable support, connections and access. Verify that installation details preserve the specified performance classification.

Fire-Rated Duct Installation

Follow the assessed duct construction and support details. Substituting joints, insulation or fixing arrangements can affect the required performance.

Smoke Shaft Coordination

Confirm shaft dimensions, continuity and access before connecting equipment. Coordinate penetrations and construction details with the responsible building teams.

Smoke Damper Installation

Use the permitted installation arrangement and provide actuator access. Confirm identification, orientation and wiring against approved schedules.

Smoke Curtain Installation

Coordinate headboxes, guides and deployment paths with the finished architecture. Installation must preserve required clearance and avoid conflict with escape routes.

Make-Up Air System Installation

Install the specified fans, louvres and openings without reducing effective free area. Check for obstructions introduced by architectural finishes or security provisions.

Fire Detection Installation

Position detection equipment according to the approved layout. Provide the access and environmental conditions needed for inspection and maintenance.

Emergency Power & Fire-Rated Cabling

Install designated circuits with the specified routing, supports and protective arrangements. Coordinate essential supply connections with the electrical design.

Smoke Control Panel Installation

Locate panels where authorised operation and maintenance are practical. Provide clear labelling, appropriate environmental protection and access.

Fire Alarm Integration

Complete interfaces against the approved cause-and-effect matrix. Record signal definitions and verify end-to-end operation during commissioning.

Testing & Commissioning of Atrium Smoke Extraction Systems

Smoke Exhaust Airflow Measurement

Measure airflow using suitable methods and calibrated instruments. Compare delivered extraction at relevant points with the approved design duty.

Fan Performance Verification

Check rotation, operating speed, electrical readings and pressure conditions. Confirm that the installed fan operates consistently with the intended system duty.

Make-Up Air Measurement

Verify mechanical supply and assess designated natural inlet paths. Review distribution and local velocities where they could affect plume behaviour.

Smoke Damper Functional Testing

Command each required position and verify physical movement and feedback. Record response issues, obstructions and discrepancies.

Smoke Curtain Deployment Test

Test deployment to the specified position and review clearances. Include the required response to power loss and other defined operating conditions.

Cause & Effect Testing

Test each specified initiating event against the expected responses. Include normal operation, defined faults and manual control priorities.

Fire Alarm Interlock Testing

Verify that alarm signals activate the correct equipment and zones. Confirm relevant feedback and reset arrangements.

Emergency Power Testing

Test the approved loss-of-normal-power scenario and transfer response. Verify that required smoke-control functions operate on the designated emergency supply.

Smoke Layer & System Performance Testing

Use the agreed verification method to assess overall performance. Ambient airflow measurements alone cannot reproduce every feature of a design fire.

Hot Smoke Testing

Where specified, specialist hot smoke testing provides controlled observations of smoke behaviour and system response under an approved test procedure.

Integrated Fire-System Testing

Test smoke extraction with related alarms, HVAC controls, curtains and pressurisation systems. The objective is to identify interface conflicts.

Fire NOC Witness Testing

Prepare for required authority or consultant witnessing with agreed procedures and completed prechecks. Record observations and close identified issues.

Testing & Commissioning Reports

Provide measured results, test records, settings and outstanding actions. These documents establish a useful baseline for handover and maintenance.

Hot Smoke Testing for Atrium Smoke Control

Purpose of Hot Smoke Testing

Hot smoke testing can demonstrate aspects of smoke movement and control response. Its scope and limitations must be agreed before testing.

Smoke Movement Observation

Observers review the test smoke path and identify unexpected spread. Findings should be interpreted against the test’s thermal and geometric limitations.

Smoke Layer Formation

Testing may show how smoke collects within reservoirs. A reduced test fire does not automatically reproduce the layer formed by the design fire.

Extraction Performance Verification

Observe whether smoke reaches and leaves through intended extraction points. Use this evidence alongside airflow measurements and engineering assessment.

Make-Up Air Performance

Review whether incoming air causes visible disturbance or unwanted smoke movement. Test conditions must reflect the agreed operating configuration.

Smoke Curtain Performance

Check that deployed curtains create the intended boundaries under the test conditions and do not introduce unexpected spill paths.

Fire Authority Witness Testing

Where witnessing is required, agree the method, precautions and acceptance observations in advance. Testing must be undertaken by competent specialists.

Atrium Smoke Extraction Service, Maintenance & AMC

Scheduled Smoke Exhaust Fan Testing

Check fan condition, operation and specified proof signals at the required intervals. Maintenance should address deterioration before it affects emergency readiness.

Smoke Damper Testing

Exercise dampers and inspect actuators, obstructions and feedback. A damper left in an incorrect position can compromise the intended airflow route.

Smoke Curtain Inspection

Inspect curtain fabric, guides, deployment paths and controls. Building changes must not obstruct deployment or reduce the specified containment function.

Fire Alarm Interlock Testing

Recheck critical interfaces after maintenance, programming changes or alterations to the alarm system.

Control Panel Testing

Review indications, commands, fault reporting and control settings. Keep documentation aligned with the installed and programmed system.

Emergency Power Testing

Verify the required standby supply and transfer functions within the approved maintenance schedule and building operating procedures.

Duct & Shaft Inspection

Inspect accessible routes for damage, leakage, obstructions and unauthorised alterations that could affect extraction performance.

Airflow Performance Testing

Compare measured performance with commissioning records where required. Investigate significant changes rather than relying only on motor operation.

Annual Integrated Fire-System Testing

Where annual integrated testing is required or adopted, coordinate the affected systems and occupants. Follow any more frequent applicable inspection and testing requirements.

Fire Audit & Compliance Support

Maintain accessible records of inspections, defects and corrective work. Discuss an AMC scope with Compress India that reflects your system and building obligations.

Common Atrium Smoke Extraction Problems & Solutions

Insufficient Smoke Extraction Airflow

Check fan operation, duct resistance, leakage, damper positions and replacement-air paths. Identify the restriction before proposing a larger fan.

Smoke Layer Descending Too Low

Review the fire assumptions, effective extraction, activation time and reservoir geometry. The solution may require coordinated changes rather than additional airflow alone.

Smoke Spreading to Upper Floors

Assess communicating openings, curtain performance and smoke-layer conditions. Correct containment gaps and review the governing plume scenario.

Incorrect Make-Up Airflow

Compare the installed supply and opening areas with the design basis. Rebalance the arrangement while checking building pressure interactions.

Make-Up Air Disrupting the Smoke Plume

Review inlet location, direction and velocity. Redistribution or increased effective inlet area may resolve excessive local disturbance.

Smoke Exhaust Fan Failure

Investigate electrical supply, controls, mechanical condition and thermal suitability. Verify the required standby response where one is provided.

Smoke Damper Failure

Inspect actuators, linkages, power and control signals. Correct binding or obstructions and retest the full operating sequence.

Smoke Curtain Failure

Check deployment clearances, guides, control inputs and power arrangements. Repairs should preserve the curtain system’s specified performance.

Excessive Duct Leakage

Locate leakage and review construction details. Apply compatible repairs and repeat the specified leakage or airflow tests.

Fire Alarm Interface Failure

Trace the initiating signal through the interface and control logic. Verify programming, wiring and the intended response through an integrated test.

Poor Cause & Effect Sequencing

Compare actual operation with the approved matrix. Resolve timing conflicts, unclear priorities and missing fault responses, then repeat scenario testing.

Atrium Smoke Extraction Retrofit & Upgrades

Retrofitting Existing Atriums

Begin with a survey of installed equipment, geometry and records. Compare the current arrangement with the building’s accepted fire strategy.

Increasing Smoke Exhaust Capacity

Additional capacity requires review of ducts, shafts, intakes, power and reservoir performance. Increasing fan duty can create new problems if supporting elements remain unchanged.

Replacing Non-Compliant Smoke Exhaust Fans

Identify the required thermal duty and performance evidence before replacement. Confirm that the new fan remains compatible with the existing system resistance.

Adding Automatic Smoke Curtains

New curtains can support revised smoke containment where justified. Coordinate deployment with architecture, access and evacuation requirements.

Adding Mechanical Make-Up Air

Mechanical supply may address inadequate replacement-air paths. Assess its pressure effects and plume interaction before selecting the equipment.

Fire-Rated Duct & Shaft Upgrades

Upgrade deficient routes using suitable assessed systems and coordinated construction details. Include access, supports and penetrations in the scope.

Smoke Damper Upgrades

Replace unsuitable or unreliable dampers with components appropriate to their smoke-control role. Update controls and position feedback as required.

Fire Alarm & Control Panel Upgrades

Revised controls can improve sequencing and fault visibility. Retest all affected interfaces following programming or equipment changes.

CFD Validation of Existing Systems

A modelling study can assess a surveyed installation against agreed scenarios. Conclusions remain dependent on accurate inputs and appropriate engineering review.

Atrium Smoke Extraction System Cost in India

Atrium smoke extraction system pricing depends on the building and the required scope. A meaningful quotation needs more than floor area: geometry, design duty, extraction routes, controls and testing requirements all influence cost.

Cost by Atrium Height & Volume

Height and geometry affect equipment access, plume assessment and installation complexity. Volume alone is insufficient for reliable budgeting.

Smoke Exhaust Fan Cost

Fan cost varies with airflow, pressure, temperature-duration rating, configuration and the required performance documentation.

Smoke Duct & Shaft Cost

Route length, dimensions, construction requirements, supports and site access influence the ductwork and shaft budget.

Smoke Curtain Cost

Curtain dimensions, performance classification, guides, controls and architectural integration determine the installed scope.

Make-Up Air System Cost

Costs depend on whether replacement air uses natural openings, mechanical supply or a combination, together with the associated controls.

Fire Alarm & Control Integration Cost

Interface quantity, panel requirements, field wiring and programming complexity influence integration costs.

CFD & Fire Engineering Cost

Specialist analysis depends on geometry, scenario count, required outputs and review scope. Define deliverables before comparing proposals.

Testing & Commissioning Cost

Budget for airflow measurements, integrated testing, documentation and any specified specialist or witness testing.

Factors Affecting Total Project Cost

New-build versus retrofit conditions, working hours, access and approval requirements can materially affect the total. Share project drawings with Compress India for an itemised quotation.

Atrium Smoke Extraction Systems in Mumbai, Navi Mumbai & Thane

Discuss Atrium Smoke Extraction Systems in Mumbai, Navi Mumbai and Thane with Compress India for new developments, operational buildings and refurbishment projects. Your proposal can be scoped around site conditions, consultant requirements and the available installation programme.

For a productive initial review, share atrium plans and sections, occupancy details, the fire strategy and any existing equipment schedules. Confirm survey availability and the required design, installation or AMC scope with our team.

Why Choose Compress India for Atrium Smoke Extraction Systems?

Choose a project approach that addresses how equipment, airflow and controls work together. Compress India focuses the discussion on your building requirements, coordinated delivery and clear scope definition.

Smoke Control & HVAC Engineering Expertise

Coordinate smoke extraction with ventilation and building services from the outset. This helps identify interfaces before installation begins.

Atrium Smoke Extraction Calculations

Request a proposal based on defined geometry, duty and design assumptions. Clear calculations make equipment selection and technical review more straightforward.

Smoke Plume & Smoke Layer Analysis

Include the relevant plume scenarios and layer objectives in the design brief. This connects the extraction arrangement to the actual atrium configuration.

CFD-Based Smoke Control Design

Where specialist modelling is needed, discuss its scope, delivery arrangements and review requirements. Define the questions the study must answer before commissioning it.

Fire-Rated Equipment & Installation

Specify the required performance documentation and installation details. Component selection and site execution must support the same design intent.

Make-Up Air & Smoke Curtain Integration

Address replacement air and containment alongside exhaust sizing. These interfaces are central to effective atrium smoke management.

Fire Alarm Cause & Effect Programming

Agree operating sequences, control priorities and fault responses before programming. A clear matrix supports efficient commissioning and future maintenance.

Testing, Commissioning & Fire NOC Support

Define measurable commissioning requirements and documentation deliverables. Approval support can be scoped around the consultant’s and authority’s stated requirements.

Retrofit & AMC Support

Discuss existing-system assessments, corrective work and maintenance coverage. A defined service plan helps preserve performance as the building changes.

Get an Atrium Smoke Extraction Solution from Compress India

Plan your atrium smoke-control requirements before equipment layouts and service routes become fixed. Compress India can help you define the required scope and prepare a project-specific proposal.

Contact Compress India to request a design consultation, site assessment or quotation for Atrium Smoke Extraction Systems.

Connect with Our Smoke Control & HVAC Team

Share your project location, building use, atrium dimensions and current stage. Include whether you need a new installation, upgrade, commissioning support or AMC.

Atrium Smoke Control Design Consultation

Provide available architectural drawings, fire consultant requirements and equipment information. These inputs help establish the next engineering steps and quotation scope.

Discuss staircase pressurisation, fire lobby pressurisation, lift shaft pressurisation, multi-zone smoke control and basement smoke extraction as part of a coordinated building strategy.

Basement Smoke Exhaust Systems

Basement Smoke Exhaust Systems

Learn More
Corridor Smoke Control Systems

Corridor Smoke Control Systems

Learn More
Mechanical Smoke Ventilation Systems

Mechanical Smoke Ventilation Systems

Learn More
Natural Smoke Ventilation Systems

Natural Smoke Ventilation Systems

Learn More
Zoned Smoke Extraction Systems

Zoned Smoke Extraction Systems

Learn More

Frequently Asked Questions

Q1: What is an atrium smoke extraction system?

An atrium smoke extraction system manages smoke within a large internal space connecting building levels. It typically combines high-level exhaust, replacement air, detection and controls, with smoke curtains or reservoirs where required.

Q2: Why is smoke extraction required in an atrium?

An atrium can allow smoke to rise and affect several floors. Dedicated smoke management helps limit accumulation and supports acceptable evacuation conditions under the approved design scenarios.

Q3: How does an atrium smoke extraction system work?

Detection initiates the specified fire-mode sequence. Exhaust removes smoke from designated collection areas, replacement air enters through planned paths, and coordinated dampers and curtains manage airflow and containment.

Q4: How is atrium smoke extraction airflow calculated?

The calculation follows the accepted design basis. It may use an applicable prescriptive air-change method, plume mass-flow calculations or a performance-based assessment, with appropriate temperature and density treatment.

Q5: How many air changes are required for atrium smoke extraction?

There is no single rate for every atrium. The applicable occupancy, code provision and prescribed calculation volume must be established; complex designs may also require plume and tenability analysis.

Q6: What is a smoke layer in an atrium?

It is the upper region where smoke accumulates. Its depth and height change as smoke enters, mixes, cools and is extracted from the atrium.

Q7: What is the minimum smoke layer height in an atrium?

The required interface height is determined from the applicable design criteria and the building’s occupied levels and escape routes. A generic height should not replace a project-specific assessment.

Q8: What is a smoke reservoir?

A smoke reservoir is a defined upper collection volume formed by roof geometry, structural boundaries or smoke curtains. It supports smoke containment and extraction.

Q9: Why is make-up air required for atrium smoke extraction?

Replacement air allows the exhaust system to achieve its intended duty. Poorly arranged make-up air can restrict extraction, disturb the smoke plume or create undesirable building pressures.

Q10: What is the difference between mechanical and natural atrium smoke extraction?

Mechanical extraction uses powered fans. Natural extraction relies on buoyancy and suitably arranged openings, with performance influenced by thermal conditions and wind. Selection depends on the building and accepted fire strategy.

Q11: What is a balcony spill plume?

It forms when smoke from an adjacent space flows beneath or across a balcony and spills into the atrium. Additional air entrainment can significantly influence the required extraction duty.

Q12: What are smoke curtains used for in atriums?

Smoke curtains help form reservoirs, guide smoke and limit spill into adjoining areas. They work with the extraction strategy and should not be assumed to provide compartment fire resistance unless specifically classified for that purpose.