Chilled Water Based PAU Systems
(Installation, Commissioning, Repair & Centralized Fresh Air Treatment Services)
Chilled Water Based PAU Systems in India
Compress India provides chilled water based PAU systems in India for commercial, institutional, healthcare and industrial HVAC applications requiring controlled fresh-air treatment.
A chilled water Primary Air Handling Unit, commonly referred to as a chilled water PAU or CHW PAU, uses chilled water supplied by a central chiller plant to cool and dehumidify outdoor air before it is distributed into occupied spaces or connected HVAC systems.
These systems are particularly suitable for buildings already equipped with centralized chilled water infrastructure and projects where fresh-air temperature, moisture control, filtration and energy performance need to be managed as part of an integrated HVAC design.
Compress India supports chilled water PAU projects from initial assessment and capacity selection through equipment integration, chilled water piping, ductwork, controls, testing, commissioning, maintenance and retrofit requirements.
For projects requiring a new chilled water primary air handling unit, replacement of an existing PAU or improvements to fresh-air and humidity performance, our team can assess the operating conditions and recommend a suitable system configuration.

What Is a Chilled Water Based Primary Air Handling Unit?
A chilled water based Primary Air Handling Unit is designed primarily to treat outdoor ventilation air before supplying it to a building or another part of the HVAC system.
Unlike a recirculation AHU that may handle a combination of return and fresh air, a PAU is commonly designed to process a high proportion—or, in many applications, 100 percent fresh air.
The unit can filter, cool and dehumidify outdoor air using a chilled water cooling coil connected to the building's centralized chilled water system.
How Chilled Water Coils Treat Fresh Outdoor Air
Warm outdoor air enters the PAU through the fresh-air intake and passes through filtration stages before reaching the chilled water cooling coil.
Chilled water flowing through the coil absorbs heat from the incoming air. When the coil surface temperature is below the dew point of the air, moisture condenses on the coil and is collected through the drain tray and condensate drainage system.
This allows a primary air handling unit with chilled water coil to perform both sensible cooling and latent moisture removal.
Centralized Fresh-Air Supply and Humidity Control
A centralized chilled water PAU can supply treated ventilation air to individual floors, multiple zones, AHUs, FCUs or directly to conditioned spaces depending on the HVAC design.
Properly selected cooling coils, chilled water temperatures, airflow and control strategies help maintain the required supply-air temperature and moisture level.
For buildings facing high outdoor humidity, especially during monsoon conditions, correct latent-load calculation and coil selection are important for achieving effective humidity control.
PAU, AHU and TFA: Terminology and System Roles
PAU, AHU and TFA units can perform related functions, but their system roles can differ.
A PAU is generally focused on treating primary or outdoor ventilation air. An AHU may condition both fresh and recirculated air, while a Treated Fresh Air unit is specifically associated with treating outdoor air before distribution.
The exact terminology used on a project should therefore be understood together with the airflow configuration, cooling system and intended HVAC function.
Main Components of a Chilled Water PAU
A chilled water PAU system combines air-side, water-side, mechanical and control components into a coordinated fresh-air treatment system.
Component selection depends on airflow, filtration requirements, cooling load, humidity conditions, available chilled water temperatures, external static pressure and project specifications.
Chilled Water Cooling Coil and Water Connections
The cooling coil is one of the most important components of a chilled water PAU.
Its capacity, number of rows, fin arrangement, face velocity, water flow and pressure drop must be matched to the required air conditions.
Supply and return water connections connect the PAU coil to the chilled water piping network. Correct valve installation, insulation, venting and balancing are essential for reliable cooling performance.
Fresh-Air Intake, Pre-Filters and Fine Filters
Outdoor air enters through a properly designed intake section before passing through the required filtration stages.
Depending on the application, a PAU may include pre-filters, fine filters or multistage filtration arrangements.
Filter selection should consider indoor air-quality requirements while also accounting for the additional resistance created across the filters.
Supply Fan, Motor and Insulated Unit Casing
The supply fan must deliver the design airflow while overcoming resistance from filters, coils, dampers, ductwork and other components.
Fan and motor selection should therefore be based on both airflow and external static pressure.
Double-skin or insulated PAU construction may be selected where improved thermal insulation, condensation resistance, acoustic performance or mechanical strength is required.
Control Valves, Sensors and Condensate Drain Assembly
Control valves regulate chilled water through the cooling coil according to cooling demand.
Temperature and humidity sensors provide feedback to the control system, while the condensate drain tray and correctly designed drain trap remove moisture collected during dehumidification.
Reliable drainage is especially important in high-humidity applications.
Applications of Chilled Water Based PAU Systems
Chilled water based PAU systems can be used wherever a central chilled water plant is available and controlled outdoor-air treatment is required.
Commercial Offices and IT Parks
Large offices and IT parks require continuous ventilation for occupied areas while maintaining indoor comfort.
A centralized chilled water fresh-air system can treat outdoor air before supplying it across multiple floors or HVAC zones, reducing the fresh-air load handled by terminal cooling equipment.
Hotels, Shopping Malls and Large Institutional Buildings
Hotels, malls and institutional facilities experience changing occupancy and ventilation demands.
A properly controlled energy-efficient chilled water PAU can coordinate fresh-air delivery with building operating schedules and occupancy requirements while supporting temperature and humidity control.
Hospitals and Healthcare Facilities
Healthcare applications can require carefully controlled ventilation, filtration, temperature and humidity.
PAU selection for hospitals should therefore consider project-specific air-change requirements, filtration levels, pressure relationships and other applicable HVAC design criteria.
Industrial Facilities with Central Chilled Water Plants
Industrial buildings with centralized chilled water infrastructure can use chilled water PAUs for ventilation air treatment, process-support spaces, control rooms, production support areas and other conditioned zones.
System selection should be based on the actual outdoor-air load and environmental requirements of each application.
Chilled Water PAU Specifications and Capacity Selection
Correct chilled water PAU capacity selection requires more than choosing an airflow value.
Air quantity, outdoor conditions, cooling load, moisture removal, chilled water parameters, filtration and system resistance must be evaluated together.
Fresh-Air Requirements and Airflow Capacity in CFM or m³/h
The first step is determining how much outdoor air the building or zone requires.
Airflow may be specified in CFM or m³/h and should be calculated according to occupancy, ventilation requirements, exhaust requirements and building pressure strategy.
Oversizing unnecessarily increases equipment and operating costs, while undersizing can compromise ventilation performance.
Outdoor Design Conditions and Sensible and Latent Loads
The PAU must be selected for the temperature and moisture content of the outdoor air entering the system.
A proper chilled water PAU cooling load calculation considers both sensible heat and latent moisture load.
In humid climates, latent capacity can be particularly important because the unit must remove moisture as well as reduce air temperature.
Cooling Capacity in TR or kW
Cooling capacity can be expressed in TR or kW.
The required capacity depends on airflow, entering-air conditions and the target leaving-air temperature and humidity.
Compress India evaluates these project parameters when recommending suitable PAU configurations rather than relying only on nominal airflow.
Entering and Leaving Chilled Water Temperatures
Coil performance depends directly on the entering and leaving chilled water temperatures available from the central plant.
The PAU should therefore be selected using the actual design conditions of the chilled water system.
Changes in chilled water supply temperature can significantly affect cooling and dehumidification performance.
Required Water Flow Rate and Coil Pressure Drop
The required chilled water flow depends on cooling capacity and the selected chilled water temperature difference.
The coil's water-side pressure drop must also be considered when checking pump performance and available differential pressure.
These parameters influence coil selection, pipe sizing and balancing requirements.
Supply-Air Temperature, Dew Point and Moisture Removal Requirements
When humidity control is important, supply-air temperature alone is not sufficient.
The design should also consider the required supply-air dew point and the amount of moisture that must be removed from outdoor air.
This is particularly relevant for a chilled water PAU for dehumidification.
External Static Pressure and Fan Selection
The fan must overcome resistance created by filters, cooling coils, dampers, silencers, ductwork and fittings.
Calculating the required PAU external static pressure allows the fan to be selected for the actual operating point rather than only nominal airflow.
Chilled Water Piping, Valve Selection and Hydronic Balancing
Correct hydronic design is essential for reliable PAU cooling.
Poor piping configuration, insufficient differential pressure, incorrect control valve selection or unbalanced water flow can cause inadequate cooling even when the PAU itself is correctly sized.
Checking Available Chiller Capacity, Pump Flow and Differential Pressure
Before connecting a new PAU to an existing plant, the available chiller capacity, pump capacity, chilled water flow and differential pressure should be evaluated.
Adding cooling coils without checking plant capacity can reduce performance elsewhere in the chilled water network.
Supply and Return Piping, Insulation and Vapour Barriers
Properly sized chilled water supply and return piping helps maintain the required flow while controlling pressure loss.
Insulation and an effective vapour barrier are necessary to prevent surface condensation, energy losses and moisture damage.
Modulating Control Valves, Balancing Valves and PICV Options
A modulating chilled water control valve allows coil water flow to respond to changes in cooling demand.
Depending on the hydronic design, separate balancing valves may be used, or a pressure independent control valve—PICV—may combine flow limitation, balancing and control functions.
Valve selection should be based on design flow, available differential pressure and control requirements.
Strainers, Isolation Valves, Air Vents and Drain Points
A professional PAU chilled water piping installation normally considers the service components required for reliable operation and maintenance.
These can include strainers, isolation valves, air vents, drain points, thermometers, pressure measurement provisions and appropriate connection accessories.
Balancing Water Flow Across Multiple PAUs and Terminal Units
When several PAUs, AHUs or FCUs share the same chilled water network, each branch should receive its design water flow.
Hydronic balancing helps prevent some units from receiving excessive water while remote or higher-resistance circuits remain starved of flow.
Fresh-Air Dehumidification and Humidity Control
Fresh-air treatment is one of the most important functions of a PAU in humid climates.
A chilled water PAU for humidity control must remove enough moisture from outdoor air to support the required indoor conditions.
Cooling Below Dew Point and Removing Condensate
Dehumidification occurs when humid air is cooled below its dew point.
Water vapour condenses on the chilled cooling coil and flows into the drain tray.
The resulting air leaves the coil with a lower moisture content before being supplied to the building.
How Chilled Water Temperature and Flow Affect Dehumidification
Cooling-coil surface temperature depends partly on the temperature and flow rate of the chilled water.
Insufficient water flow or chilled water supplied at a temperature higher than the design requirement may reduce the coil's ability to reach the required leaving-air condition.
Supply-Air Temperature and Dew Point Control
Stable humidity control requires coordination between chilled water flow, coil capacity, airflow and control sensors.
Monitoring supply-air temperature together with humidity or dew point can provide better control than relying on dry-bulb temperature alone in moisture-sensitive applications.
Optional Reheat for Supply-Air Temperature Adjustment
In some applications, air may need to be cooled sufficiently to remove moisture but would then be too cold for direct supply.
A properly engineered reheat arrangement can raise the dry-bulb temperature after dehumidification while maintaining the reduced moisture content.
Whether reheat is required depends on the project and control strategy.
Monsoon and Part-Load Humidity Control
High-humidity periods can be challenging because latent load may remain significant even when sensible cooling demand is relatively low.
Correct coil control, fan operation and plant coordination help prevent indoor humidity from rising during monsoon or part-load conditions.
Integration with Centralized HVAC and Air Distribution
A chilled water PAU should be considered as part of the complete HVAC system rather than as an isolated piece of equipment.
Air distribution, chilled water generation, pumps, controls, exhaust systems and terminal units all affect overall performance.
Supplying Treated Fresh Air to FCUs, AHUs and Conditioned Spaces
Treated primary air can be supplied to FCU-served spaces, connected to AHU systems or delivered directly into occupied zones depending on the design.
Chilled water PAU integration with FCU systems can allow FCUs to address room loads while the PAU handles the ventilation-air load.
Duct Sizing and Airflow Balancing Across Floors and Zones
The duct network must distribute the required air quantity to each area without excessive pressure loss or noise.
After installation, airflow balancing helps confirm that the design air volume reaches individual floors, zones and outlets.
Coordinating Fresh-Air Supply, Exhaust and Building Pressure
Fresh-air quantities should be coordinated with toilet exhaust, kitchen exhaust, process exhaust and other extraction systems.
Maintaining an appropriate balance between supply and exhaust helps achieve the intended building pressure relationship and reduces uncontrolled outdoor-air infiltration.
Chilled Water PAU Installation and Commissioning by Compress India
Compress India supports chilled water PAU installation and commissioning with attention to equipment positioning, chilled water piping, duct connections, drainage, controls and final performance verification.
The objective is not simply to install the equipment, but to ensure the complete PAU system operates under its intended conditions.
Site Assessment, Equipment Positioning and Service Access
Installation planning starts with reviewing the available plant space, equipment dimensions, access routes and service requirements.
Adequate clearance should be provided for filter replacement, coil cleaning, fan servicing, valve maintenance and other routine activities.
Chilled Water Connections, Ductwork and Condensate Drain Installation
Supply and return piping should be installed according to the approved hydronic arrangement, while duct connections should be properly sealed and supported.
Condensate drainage requires appropriate slope and trap configuration to ensure reliable removal of water from the PAU.
Pipework Pressure Testing, Flushing and Air Removal
Before regular operation, chilled water pipework may require hydrostatic pressure testing in accordance with the project's approved procedure.
Flushing helps remove construction debris and contaminants, while air removal helps prevent circulation problems caused by trapped air.
Water Flow Balancing and Control Valve Calibration
After the system is operational, chilled water flow through the PAU coil should be checked against the design requirement.
Balancing valves, PICVs or other flow-control devices should be set appropriately, and modulating valve operation should be verified through its control range.
Airflow, Cooling Capacity and Humidity Performance Verification
Commissioning should verify more than fan rotation and equipment start-up.
Airflow, temperatures, chilled water conditions, pressure values and—where relevant—humidity performance should be checked to confirm that the installed system is delivering the intended results.
BMS Testing and Commissioning Documentation
Where the PAU is connected to a Building Management System, control commands, sensor readings, alarms, status signals and interlocks should be tested.
Project documentation can include relevant commissioning readings, control checks and equipment information as required by the project scope.
Controls, BMS Integration and Energy Optimization
Modern chilled water PAU BMS integration can improve monitoring, operational control and energy performance.
The appropriate strategy depends on the building's ventilation requirements and central plant configuration.
Coordinated Temperature, Humidity and Water Valve Control
Temperature and humidity sensors can be used to modulate chilled water flow through the coil.
This allows cooling output to respond to changing outdoor-air and building conditions rather than operating continuously at maximum capacity.
Fan Speed Control and Demand-Based Fresh-Air Operation
A VFD can adjust fan speed where variable airflow operation is appropriate.
Depending on the application, ventilation demand may also be coordinated with occupancy schedules, air-quality sensors or other control inputs.
Any demand-based strategy should continue to satisfy the minimum ventilation requirements of the building.
Chiller, Pump and PAU Operating Interlocks
Coordinating PAU operation with pumps and chilled water generation equipment can help prevent unnecessary operation and avoid running the PAU when cooling water is unavailable.
Suitable interlocks depend on the plant and BMS architecture.
Filter Pressure Monitoring, Fault Alarms and Performance Logging
Differential pressure monitoring can help identify increasing filter resistance.
BMS alarms can also be configured for temperature deviations, fan faults, sensor failures and other important operating conditions.
Performance trends provide useful information for maintenance and troubleshooting.
Water Temperature Difference and Part-Load Energy Performance
Monitoring chilled water supply and return temperatures can help identify changes in coil and system performance.
Unexpectedly low temperature difference may be associated with excessive flow, control issues, reduced heat transfer or other hydraulic conditions that require investigation.
Chilled Water PAU Maintenance, Repair and AMC Services
Preventive maintenance helps a chilled water fresh air handling unit maintain airflow, heat-transfer performance, drainage and control accuracy.
Compress India can support inspection, troubleshooting, maintenance and repair requirements according to the installed equipment and project scope.
Filter, Cooling Coil, Drain Tray and Strainer Maintenance
Dirty filters increase resistance and can reduce airflow.
Contaminated cooling coils reduce heat transfer, while blocked drain trays or condensate lines can result in water accumulation and leakage.
Strainers within the chilled water circuit should also be inspected as required to maintain water flow.
Troubleshooting Low Water Flow, Air Locks and Valve Faults
Low chilled water flow can result from incorrect balancing, blocked strainers, closed valves, air accumulation, actuator problems, inadequate differential pressure or other system conditions.
Systematic diagnosis helps identify the actual cause rather than treating only the resulting temperature problem.
Diagnosing Poor Cooling, High Humidity and Low Airflow
If a chilled water PAU is not cooling effectively, technicians should evaluate both the air and water sides of the system.
Possible areas for inspection include filters, airflow, coil cleanliness, chilled water temperature, water flow, valves, sensors and operating setpoints.
Persistent high humidity may additionally require assessment of latent load and coil dew-point performance.
Water Leakage, Insulation Damage and Condensation Problems
Water around a PAU does not always indicate a leaking cooling coil.
Condensate drain blockage, incorrect traps, damaged insulation, vapour-barrier failure or condensation on cold pipes can also create visible moisture.
Inspection should identify the source before repairs are carried out.
Sensor Calibration, Preventive Maintenance and AMC Coverage
Temperature and humidity sensors can drift over time and should be checked according to the maintenance strategy.
A structured chilled water PAU preventive maintenance or AMC programme can cover periodic inspections, cleaning, operational checks and identification of developing faults before they lead to major disruption.
Contact Compress India to discuss maintenance requirements for existing chilled water PAU installations.
Chilled Water PAU Price and Operating Costs
There is no single standard chilled water PAU price in India because equipment and installation requirements vary significantly from one project to another.
Airflow, cooling capacity, filtration, casing construction, controls, piping requirements and site conditions all influence project cost.
How Airflow, Coil Capacity and Filtration Affect Equipment Price
Higher airflow generally requires larger fans, filters, coils and casing dimensions.
Cooling capacity, filtration level, fan configuration, casing specification and control requirements can therefore substantially influence the final equipment price.
Piping, Valve Assemblies, Controls and Installation Costs
The complete chilled water PAU installation cost can include more than the PAU itself.
Chilled water piping, insulation, valves, strainers, supports, duct connections, drainage, electrical work, BMS controls and commissioning requirements may all form part of the project.
Existing Plant Capacity vs Chiller and Pump Upgrade Requirements
Connecting a PAU to an existing chilled water system can be economical when sufficient spare cooling and pumping capacity is available.
If the plant has insufficient capacity, additional pumps, modifications or chiller upgrades may be required.
This is why existing plant conditions should be evaluated before finalizing a quotation.
Fan, Pump and Chiller Energy Costs
Operating cost depends on the efficiency and operating hours of the fan, chilled water pumps and chiller plant.
Pressure losses, chilled water temperature, flow control, fan speed and maintenance condition can all influence energy consumption.
Chilled Water vs DX PAU: Installation and Lifecycle Cost Comparison
A chilled water PAU vs DX PAU comparison should consider the complete project rather than equipment price alone.
A chilled water PAU can integrate effectively into buildings with an existing central chilled water plant, while a DX PAU uses a refrigerant-based direct-expansion cooling arrangement.
Capital cost, plant infrastructure, capacity, redundancy, maintenance and operating strategy should all be considered when selecting between the two.
For an accurate recommendation, Compress India can review your airflow, cooling requirement and existing HVAC infrastructure.
Request a Chilled Water PAU Assessment and Quotation
Planning a new chilled water based PAU system, replacing an existing unit or experiencing inadequate cooling, high humidity, low airflow or chilled water flow problems?
Compress India can assist with evaluation of the complete PAU installation, including fresh-air requirements, cooling capacity, chilled water coil selection, piping, valves, hydronic balancing, duct integration, controls, BMS requirements and commissioning.
Whether the requirement involves a modular chilled water PAU, double-skin unit, centralized fresh-air system, PAU retrofit or integration with an existing chilled water plant, the system should be selected around actual site conditions rather than nominal equipment capacity alone.
Share your available drawings, airflow requirement, chilled water parameters, existing HVAC information or equipment details with Compress India to discuss a suitable technical solution and quotation.
Contact Compress India today for a chilled water PAU system assessment, installation requirement, retrofit, maintenance service or project quotation.
Connect with Our HVAC Engineering Team
For professional installation, commissioning, repair, retrofitting, automation integration, preventive maintenance, or AMC services for Primary Air Handling Units (PAU), connect with our HVAC engineering team for centralized fresh air treatment solutions.
Related Primary Air Handling Units (PAU)
Explore other primary air handling unit configurations for different cooling sources, airflow duties, installation arrangements and humidity control needs.

DX Based Primary Air Handling Units
Learn More
Modular PAU Units
Learn More
High Static Pressure PAUs
Learn More
Low Temperature Dehumidification PAUs
Learn More
Roof Mounted PAU Units
Learn MoreFrequently Asked Questions About Chilled Water Based PAU Systems
What Is the Difference Between a Chilled Water PAU and a DX PAU?
A chilled water PAU uses chilled water from a central plant as the cooling medium through its cooling coil.
A DX PAU uses a direct-expansion refrigerant circuit.
The appropriate solution depends on the project's existing infrastructure, required capacity, controls, redundancy and lifecycle requirements.
How Does a Chilled Water PAU Differ from a TFA Unit?
Both can be used to treat outdoor air.
PAU generally describes a primary-air unit supplying treated ventilation air, while TFA refers to a Treated Fresh Air unit.
In practice, terminology can overlap, so the actual equipment configuration, airflow arrangement and cooling method should be reviewed.
Can a PAU Be Connected to an Existing Chilled Water Plant?
Yes, subject to engineering verification.
The existing plant should have sufficient chiller capacity, pump flow and differential pressure to support the additional PAU load without negatively affecting existing equipment.
Can Both Air-Cooled and Water-Cooled Chillers Supply a PAU?
Yes.
A chilled water PAU requires appropriately controlled chilled water at the required design temperature and flow.
Whether that chilled water is generated by an air-cooled or water-cooled chiller depends on the central plant design.
What Chilled Water Temperature and Flow Rate Are Required?
There is no universal value suitable for every PAU.
Required entering-water temperature, leaving-water temperature and flow rate depend on cooling capacity, coil selection, entering-air conditions and target leaving-air conditions.
The values should be determined during equipment and system selection.
Can One PAU Supply Fresh Air to Multiple Floors?
Yes, a centralized PAU can supply multiple floors or zones when the duct distribution system is designed accordingly.
Airflow quantities, duct pressure losses, fire and smoke-control requirements, balancing and control zoning should be considered during design.
Why Does Indoor Humidity Remain High Despite Adequate Cooling?
A space can reach its required dry-bulb temperature while still having excessive moisture.
Possible causes include insufficient dehumidification capacity, high outdoor-air infiltration, inadequate coil surface temperature, excessive chilled water temperature, poor airflow control or incorrect ventilation balance.
A detailed system assessment is recommended when high humidity persists.
How Is Chilled Water Flow Balanced Through the PAU Coil?
The required design flow can be established using balancing valves, pressure independent control valves or another suitable hydronic balancing arrangement.
Flow should be verified against design requirements while considering the available differential pressure and control-valve characteristics.
When Should a PICV Be Used Instead of Separate Control and Balancing Valves?
A PICV can be useful where pressure-independent flow regulation and modulating control are required in a single valve arrangement.
Whether it is preferable to separate control and balancing valves depends on the system design, differential pressure, required authority, controls strategy and project specification.
How Often Should a Chilled Water PAU Be Serviced?
Maintenance frequency depends on operating hours, outdoor-air quality, filtration load, equipment type and environmental conditions.
Filters may require more frequent attention than mechanical components.
A planned maintenance programme should therefore be developed according to the actual installation rather than relying on one interval for every component.
What Information Is Needed for an Accurate Quotation?
For a more accurate chilled water PAU quotation, useful information includes:
- Required fresh-air volume in CFM or m³/h
- Project location
- Outdoor design conditions
- Required supply-air temperature and humidity
- Chilled water supply and return temperatures
- Available chilled water flow and differential pressure
- Required cooling capacity, if already calculated
- External static pressure
- Filtration requirements
- Unit dimensions or available installation space
- Indoor or outdoor installation requirement
- Existing chilled water plant details
- Ductwork requirements
- Chilled water piping requirements
- Control and BMS requirements
- Electrical requirements
- Existing equipment details for replacement or retrofit projects
Where some of this information is unavailable, a site and system assessment can help establish the required design parameters.