Modular PAU Units
(Installation, Commissioning, Repair & Centralized Fresh Air Treatment Services)
Modular PAU Units for Commercial & Industrial Fresh Air Systems
Introduction
Fresh air should support your building's comfort and air quality without introducing uncontrolled heat, moisture or dust. Modular PAU Units treat incoming outdoor air before it enters occupied areas or connects with the wider HVAC system.
PAU means Primary Air Handling Unit, also commonly called a primary air unit. Its functions can include filtration, cooling, dehumidification, heating or reheat, and controlled air delivery. Modular construction arranges these functions into individual sections selected for the application, installation space and service requirements.
Compress India provides modular PAU installation, commissioning, repair, retrofitting, automation integration and maintenance services. Whether you are planning a new fresh-air system or addressing poor performance in an existing building, we help connect equipment selection with practical site execution.
Explore the configurations, technical considerations and service requirements below. For projects in Mumbai, Maharashtra or elsewhere in India, share your drawings and operating requirements to discuss a project-specific solution.
Request a Modular PAU Quotation | Discuss Your Fresh-Air Requirements

What Are Modular PAU Units?
A modular primary air handling unit is a sectional air-treatment assembly configured to condition outdoor air. In a dedicated fresh-air application, it typically processes 100% outdoor air and delivers it through a centralized distribution network.
The PAU's job is to manage ventilation air; the word modular describes how its sections are constructed and assembled. Modularity alone does not determine cooling capacity, humidity performance or filtration efficiency.
These systems can operate alongside chilled-water plants, DX refrigeration, AHUs, fan coil units and VRF systems. Air delivery, cooling connections and controls must follow the approved system design. Serving a building with VRF equipment does not automatically make a PAU compatible with that system's refrigerant circuit.
What Makes a PAU “Modular”?
Separate intake, filter, coil, fan and control sections form a coordinated air-treatment assembly. Their sequence and dimensions depend on the selected equipment platform and duty. Approved shipping sections can simplify delivery and site assembly while allowing the treatment process to match the building's requirements.
Where Modular Construction Is Useful
Sectional equipment is useful where plant-room doors, corridors or lifting routes restrict access. It also suits projects needing additional filtration, demanding humidity control, special casing materials or an unusual layout. Indoor, outdoor and future modification requirements should be evaluated before selecting the unit.
How Modular PAU Units Work
A typical treatment sequence is outlined below. Fan position, heat recovery and optional sections can change the physical arrangement. Monitoring and control operate throughout the process.
Stage 1 – Outdoor Air Intake
Outdoor air enters through a suitably located intake with louvers, screens and dampers. Intake placement should limit exposure to exhaust outlets, traffic emissions and rain. Local temperature and humidity conditions establish the load that downstream treatment sections must handle.
Stage 2 – Air Filtration
Pre-filters capture larger particles, while fine filters provide additional particle removal. Higher-efficiency stages are selected where the application requires them. Filter area, sealing and pressure drop matter: poorly installed or blocked filters can compromise both fresh-air filtration and airflow delivery.
Stage 3 – Cooling and Dehumidification
A chilled-water or DX cooling coil reduces air temperature. When the coil surface is below the incoming air's dew point, moisture condenses and drains away. Coil selection must account for sensible cooling and latent cooling load, particularly during humid outdoor conditions.
Stage 4 – Heating or Reheat
Heating is included where the climate or process requires it. Reheat can raise the temperature of already dehumidified air to the required supply condition. Reheat lowers relative humidity by increasing temperature; the cooling or dehumidification stage performs the moisture removal.
Stage 5 – Air Movement
The fan moves air through the treatment sections and distribution network. Its duty must provide the required airflow against the combined resistance of internal components and external ductwork. Fan selection should consider the expected increase in filter resistance during service.
Stage 6 – Conditioned Fresh-Air Supply
Treated air travels through insulated ducts to occupied spaces or approved HVAC connection points. Where supply connects with FCUs or other terminal equipment, inlet conditions, pressure and control coordination must suit that equipment. Airflow balancing helps each zone receive its intended ventilation quantity.
Stage 7 – Monitoring and Control
Temperature, humidity and differential-pressure sensors provide operating feedback. Controls can coordinate cooling valves, compatible DX equipment, dampers and fan speed. DDC or BMS integration supports schedules, alarms and performance monitoring when the selected controllers and communication interfaces are compatible.
Main Sections and Components of a Modular PAU
Each section has a defined purpose. The final arrangement should include the functions your application needs, with enough access to inspect and maintain them.
Casing and Structural Frame
The frame supports the assembly, while casing panels contain the air stream. Rigidity, insulation and sealed joints influence leakage, heat gain and noise. Access provisions should allow inspection without damaging panels or repeatedly disturbing permanent connections.
Fresh-Air Intake and Damper Section
The intake section connects outdoor air to the unit. Isolation dampers support shutdown, while motorized dampers can regulate airflow under the approved control sequence. Damper size, leakage characteristics and actuator access should match the ventilation duty.
Filter Section
Filter sections may accommodate pre-filters, fine filters, bag filters or specified HEPA stages. Selection depends on particle-removal requirements and available fan pressure. Secure mounting, sealed frames, accessible replacement space and differential-pressure monitoring help sustain the intended filtration performance.
Cooling Coil Section
Chilled-water coils transfer heat to circulating water; DX coils use refrigerant evaporation. Coil rows, circuiting, tube and fin materials, face velocity and air-side pressure drop affect performance. Selection must demonstrate the required leaving-air condition and manageable condensate carryover.
Heating / Reheat Section
Electric heaters, hot-water coils or compatible recovered-heat arrangements can provide heating or reheat. The chosen method should suit the available utilities and operating cost targets. Electric heating requires coordinated airflow proving, overtemperature protection and electrical capacity.
Fan and Motor Section
Fan arrangements can include housed centrifugal fans or plug fans with direct-drive or belt-driven motors. EC fans and VFD-compatible motors provide speed-control options where suitable. Selection should consider the actual operating point, efficiency, service access and vibration isolation.
Drain Pan and Condensate Management
The drain pan collects moisture removed at the cooling coil. Suitable materials, effective slope and accessible outlets help prevent standing water. Drain traps must match the pressure at the drain connection, with cleaning access and a route that allows reliable condensate discharge.
Heat Recovery Section
A wheel, plate heat exchanger, heat pipe or run-around coil can recover energy where compatible air streams and site arrangements permit. Selection should consider recoverable energy, added pressure drop, maintenance and possible contaminant transfer. Sensitive applications require particular care over exhaust-stream suitability.
Humidification and Dehumidification Options
Some processes need moisture added during dry conditions; others require deeper dehumidification than a standard cooling coil can provide. Humidifier type, absorption distance, water quality and drainage need review. Low dew-point duties may require a specialist dehumidification arrangement.
Silencer and Acoustic Section
Acoustic attenuators can reduce sound travelling through the air path. Their selection should balance noise reduction against pressure drop, space and cleanability. Offices, hotels and other noise-sensitive areas benefit from considering both duct-borne sound and noise radiated through the casing.
Controls and Instrumentation
The control package can include temperature and RH sensors, pressure monitoring, airflow measurement, actuators and a control panel. Fan-speed control and BMS connectivity depend on the selected equipment. Defined operating sequences and alarm settings make readings useful for daily operation and troubleshooting.
Modular PAU Construction and Build Options
Construction should suit the air conditions inside the unit and the environment around it. The descriptions below explain selection choices; actual materials and options are confirmed in the approved equipment submittal.
Single-Skin vs Double-Skin Construction
Single-skin construction uses one casing layer, with insulation arrangements depending on the design. Double-skin panels enclose insulation between inner and outer skins. A double skin modular PAU can offer a protected internal surface and improved thermal or acoustic performance when its complete casing design supports those requirements.
Panel and Insulation Options
Panel thickness, insulation material and density should be considered together with thermal conductivity, moisture resistance and fire requirements. Thickness alone does not establish casing performance. Select an assembly that limits unwanted heat transfer, protects insulation and supports the application's acoustic and condensation-control needs.
Frame and Casing Materials
Galvanized steel, pre-coated galvanized steel, aluminium and stainless steel are potential material choices across different equipment designs. Selection depends on structural duty, corrosion exposure, hygiene and cleaning methods. Internal and external materials may differ and should be clearly identified in the specification.
Thermal-Break Construction
A thermal break interrupts conductive paths through frames or panel connections. This can reduce thermal bridging and the risk of cold external surfaces attracting condensation. Performance still depends on the full casing assembly, air temperatures and surrounding humidity; thermal breaks alone cannot guarantee condensation-free operation.
Access Doors and Serviceability
Hinged doors or removable panels should provide practical access to filters, coils, fans and drains. Gaskets maintain sealing after service. Inspection windows and internal lighting may be specified where useful, with sufficient space outside the unit for opening doors and withdrawing components.
Indoor and Outdoor Construction
Indoor units need protection appropriate to plant-room conditions. Outdoor units require weather-resistant panels, joints and roof details, suitable corrosion protection and electrical enclosures selected for exposure. Support, drainage, anchoring and safe maintenance access are also part of an outdoor installation.
Available Modular PAU Configurations
The right configuration combines the cooling source, airflow arrangement and installation layout. Availability depends on the selected OEM platform and project specification.
Chilled-Water Modular PAU
A chilled water modular PAU uses a cooling coil connected to the central chilled-water system. Coil performance depends on water temperatures, flow and entering-air conditions. This arrangement can suit buildings with an existing chiller plant and adequate capacity for the added fresh-air load.
DX Modular PAU
A DX modular PAU uses a refrigerant cooling coil connected to compatible condensing equipment. Selection should verify fresh-air duty, operating range, capacity modulation and humidity performance. VRF refrigerant integration requires specifically approved equipment and controls; it is not a universal DX connection option.
Horizontal Floor-Mounted Configuration
Horizontal sections are arranged along the plant-room floor, allowing a clear treatment sequence and side access. Confirm the overall length, component withdrawal space and duct connections early. A suitable base and lifting route are essential for practical installation.
Vertical Configuration
A vertical modular PAU can reduce floor footprint by arranging the airflow path vertically. Available height, structural support, drain routing and access to elevated components must be checked. A smaller footprint is useful only when servicing remains practical.
Double-Deck / Stacked Configuration
Stacked arrangements can place approved sections or supply and extract paths above one another. They may help where floor space is limited, but require suitable support and access at each level. Internal airflow transitions and maintenance routes should be reviewed before approval.
Indoor Modular PAU
An indoor unit is installed within a plant room or protected service area. Equipment selection should account for room temperature, humidity, drainage and nearby occupied spaces. Keep delivery routes, ventilation around service areas and component access clear throughout the layout.
Outdoor Modular PAU
Outdoor or roof-mounted units need construction suitable for weather exposure. Roof loading, anchoring, corrosion exposure, rain protection and maintenance access influence the installation. Outdoor air intake and discharge locations should also be coordinated with other building services.
Draw-Through and Blow-Through Arrangements
In a draw-through arrangement, the fan is downstream of the cooling coil; in a blow-through arrangement, it is upstream. Fan position affects coil airflow, casing pressures, drainage and where fan heat enters the air stream. Select the arrangement against the required final supply conditions and equipment layout.
Filtration Configurations for Modular PAU Units
Specify filtration around outdoor air quality and the required supply-air quality. Adding more stages without checking fan duty, sealing and maintenance access can reduce system performance.
Pre-Filtration
Pre-filters capture larger particles before they reach coils and downstream filters. This helps protect treatment components and can extend the service life of finer filtration stages. The selected filter should match the intake environment and be accessible for routine inspection.
Fine Filtration
Fine filters target smaller airborne particles according to their documented classification. They can support indoor air quality in commercial and industrial buildings. Media type, filter area and dust-loading performance should be assessed alongside the required removal efficiency.
High-Efficiency / HEPA Filtration
HEPA filtration may be specified for particular healthcare, pharmaceutical or cleanroom duties. Its location, housing seals and testing requirements must match the application. A HEPA stage in the PAU alone does not establish cleanroom classification or satisfy every healthcare ventilation requirement.
Application-Specific Filtration
Offices, hospitals, production facilities and controlled environments have different filtration needs. General particle filters do not remove every gas or odour; those duties may require separate treatment media. Select stages against the actual contaminants and approved application requirements.
Filter Pressure Drop and Monitoring
Filters create resistance that generally rises as dust accumulates. Differential-pressure monitoring helps identify when service is needed. A constant-airflow fan may consume more power as resistance increases, while an unregulated fan can deliver less air. Replacement limits should follow the selected filter and operating requirements.
Cooling, Humidity and Psychrometric Performance
For modular PAU units for high outdoor air humidity, cooling capacity alone is an incomplete selection criterion. Psychrometric analysis checks how air temperature and moisture content change through each treatment stage.
Outdoor Design Conditions
Use location-specific dry-bulb and wet-bulb conditions, with humidity data consistent with the design basis. The hottest condition may differ from the most demanding dehumidification condition. Evaluate seasonal and part-load operation where they influence the required treatment performance.
Required Supply-Air Conditions
Define supply-air temperature and moisture content, using dew point or humidity ratio where appropriate. Relative humidity must be interpreted with temperature. The selected supply condition should account for the room's moisture load, ventilation quantity and contribution from other cooling equipment.
Sensible and Latent Cooling Loads
Sensible load relates to reducing air temperature; latent load relates to removing moisture. Outdoor air can carry a substantial latent load even when its temperature is moderate. Evaluate both loads to avoid selecting a unit that cools adequately but leaves the building too humid.
Coil Selection and Apparatus Dew Point
Apparatus dew point represents the effective coil-surface condition used in assessing cooling and dehumidification. Leaving-air performance also depends on airflow, contact with the coil and cooling-medium conditions. Confirm the selected coil's predicted duty rather than judging performance by row count alone.
Condensate Removal
Moisture condensed at the coil must leave the unit through a properly designed drain pan and drain connection. Poor drainage can cause overflow, wet insulation and hygiene problems. Coil face velocity and pan coverage should also limit moisture carryover into downstream sections.
Reheat Strategy
Where dehumidification produces air colder than the required supply temperature, reheat can adjust the final condition. Heating does not remove additional moisture. Evaluate recovered heat and other suitable sources against capital cost, energy use and the approved operating sequence.
Key Features of Modular PAU Units
Select features for their contribution to the building's operating requirements. The following capabilities depend on the chosen configuration and should be confirmed in the equipment proposal.
Configurable Sectional Construction
Individual treatment sections create an application-specific air path. This lets the design combine only the required functions and arrange approved shipping splits. It is particularly useful for complex ventilation duties and buildings with limited equipment access.
Multi-Stage Filtration Capability
Successive filter stages can protect components and deliver the specified particle-removal performance. Correct seals and pressure monitoring help maintain that performance in use. Higher-filtration applications benefit when the fan and service arrangements are designed around the complete filter package.
Chilled-Water and DX Cooling Options
Equipment can be selected with a cooling source suited to the project. Water-based coils connect with an appropriate chilled-water plant, while DX coils require compatible refrigerant equipment. This flexibility helps new-build and retrofit projects use suitable existing infrastructure.
High-Static-Pressure Air Delivery
A fan selected for the required pressure can deliver air through extensive ducts and treatment sections. This supports buildings with long distribution routes or demanding filtration. The required duty should be calculated carefully, because unnecessary pressure increases fan power and noise.
Energy-Efficient Fan Options
Efficient fan and motor combinations reduce losses at the selected operating point. VFD-compatible motors and EC fans can provide controlled speed adjustment. Buildings with changing ventilation demand can benefit when control settings maintain the required airflow and pressure relationships.
Thermal and Acoustic Insulation
Insulated casing can limit unwanted heat transfer and reduce radiated noise. Performance depends on the panel assembly, frame and seals. This is especially relevant where cold treated air passes through humid plant rooms or equipment sits near occupied areas.
Flexible Controls and BMS Integration
Compatible controls can coordinate sensors, dampers, cooling and fan speed while reporting operating status to the BMS. Defined alarms and trend data help operators identify deviations. Multi-zone commercial buildings and facilities teams benefit from visibility into fresh-air system performance.
Service-Friendly Component Access
Accessible filters, coil faces, drain pans and fan assemblies make routine servicing more practical. Door layout and component withdrawal space should be planned together. Buildings requiring regular maintenance benefit from access that reduces dismantling and supports thorough inspection.
Application-Specific Material Selection
Casing, drain-pan and coil materials can be specified for the environment and cleaning requirements. Suitable corrosion resistance and cleanable surfaces support equipment life and hygiene. Coastal locations, healthcare areas and industrial processes may require closer material review.
Flexible and Adaptable Configuration
Some modular platforms permit approved changes to sections or components. Adaptability depends on dimensional compatibility, structural limits and available fan or coil capacity. It can support planned future upgrades when expansion provisions are assessed during initial selection.
Benefits of Modular PAU Units
A well-selected modular system can make fresh-air treatment easier to install, operate and maintain. These benefits depend on sound engineering and the capabilities of the selected equipment.
Greater Design Flexibility
Section selection allows the treatment process to match airflow, filtration and moisture-control requirements. This helps avoid an unsuitable fixed arrangement while keeping the design focused on the functions the building actually needs.
Easier Transportation and Site Assembly
Approved shipping sections can pass through access routes that cannot accommodate one large assembled unit. Planning section dimensions, weights and joining methods early can simplify delivery and reduce installation disruption in occupied buildings.
Better Space Utilization
Horizontal, vertical and selected stacked arrangements provide layout choices. Matching the unit to the available plant-room geometry can improve space use, provided access doors, component withdrawal areas and drain arrangements remain practical.
Easier Inspection and Maintenance
Dedicated access to individual components helps technicians inspect and clean the treatment path. This supports preventive maintenance and timely fault detection, with less need to disturb unrelated sections during routine service.
Adaptability to Specialized IAQ Requirements
Suitable filter stages, cleanable construction and moisture control can support demanding indoor-air-quality requirements. The treatment strategy should address the actual contaminant sources and work alongside ventilation distribution, exhaust and housekeeping practices.
Improved Temperature and Humidity Control
Correct coil selection, drainage and coordinated controls help maintain the required fresh-air supply conditions. This can reduce uncontrolled moisture entering occupied spaces and support the wider HVAC system during humid weather.
Integration with Existing HVAC Systems
The PAU can be coordinated with chillers, compatible DX equipment, FCUs, ducts and building controls. Assessing connection conditions and spare capacity supports an upgrade that works with the existing building services.
Future System Modification
Where the selected platform permits, individual sections or components may be modified or replaced. Future changes still require engineering review of airflow, pressure, cooling duty, controls and space; modular construction does not make every upgrade interchangeable.
Applications of Modular PAU Units
The application determines which sections matter most and how the equipment should integrate with the building.
Dedicated Fresh-Air Treatment
A dedicated PAU filters and conditions ventilation air separately from room cooling equipment. Intake protection, cooling, drainage and supply controls are central to this duty. Coordinate the treated-air quantity and condition with each zone's ventilation and moisture requirements.
High Fresh-Air-Load Applications
Buildings with substantial occupancy or make-up-air demand need equipment sized for a significant outdoor-air load. Coil duty, fan pressure and intake capacity deserve particular attention. Heat recovery may be worth assessing where a suitable exhaust stream is available.
Humidity-Controlled Spaces
Moisture-sensitive spaces require a defined supply-air dew point and a coordinated room-control strategy. Cooling or specialist dehumidification, reliable drainage and optional reheat are important. Check part-load conditions as well as peak cooling duty.
High-Filtration Environments
Facilities with demanding particle-control requirements may need multiple filter stages and verified housing integrity. Include adequate fan pressure and accessible replacement space. Final room performance also depends on terminal filtration, air distribution and the wider contamination-control design.
Positive-Pressure Applications
Treated make-up air can support positive pressure where the approved design calls for it. Supply must be coordinated with extract, transfer air and building leakage. Pressure sensors and airflow controls may be needed; some healthcare or process areas require negative pressure instead.
Central HVAC Systems with FCUs
A PAU can manage ventilation-air treatment while FCUs address the allocated room load. Coil selection and air-delivery connections must suit both systems. Verify the FCUs' remaining sensible and latent duties against the actual PAU supply conditions.
Buildings with Restricted Plant-Room Access
Sectional delivery can help bring equipment through narrow entrances and service corridors. Confirm every section's dimensions and weight against the full route. Site joining space, lifting arrangements and sealed connections are essential to a workable installation.
Retrofit and Replacement Projects
Modular PAU replacement can address ageing equipment, access constraints or changed fresh-air requirements. Review existing ducts, cooling utilities, drainage, power and controls before selecting the replacement. Plan shutdowns and temporary arrangements around the building's operation.
Customized Air-Treatment Applications
Some projects require a specific combination of filtration, humidity treatment, heat recovery or acoustic attenuation. Define the required outlet conditions and process restrictions first. The assembled sections must function as one coordinated system with verified pressure and control performance.
Industries Using Modular PAU Units
Commercial modular PAU units and industrial modular PAU units share core treatment functions, but their specifications can differ considerably. Select equipment against the needs of the space being served.
Pharmaceutical and Cleanroom Facilities
Controlled environments can require precise moisture control, cleanable construction and specified filtration. Fresh-air treatment must coordinate with recirculation, terminal filters and room-pressure relationships. Cleanroom classification and process qualification depend on the complete facility system and its validation requirements.
Hospitals and Healthcare Facilities
Healthcare ventilation requirements vary by room use and infection-control strategy. Assess outdoor-air quantity, filtration, hygiene and pressure relationships for each area. A general PAU configuration should not be assumed suitable for every clinical, isolation or procedure room.
Commercial Buildings and Offices
Office buildings need ventilation suited to occupancy and operating hours. Fresh-air filtration, moisture control and efficient fan operation support comfort. Integration with FCUs, AHUs or VRF-served spaces should preserve the required outdoor-air delivery to each zone.
IT Parks and Data Centre Support Areas
Offices and occupied support areas can benefit from centralized fresh-air treatment. Operating schedules, internal occupancy and moisture requirements influence selection. Ventilation for these areas should be coordinated with, and assessed separately from, the data centre's technical equipment-cooling design.
Hotels and Hospitality
Guest rooms, meeting spaces and public areas can have different ventilation schedules and humidity loads. Quiet fans, acoustic treatment and stable moisture control are useful. Coordinate treated fresh air with bathroom, kitchen and other extract systems.
Shopping Centres and Retail Spaces
Retail ventilation demand can vary with occupancy and trading hours. Fan control and suitable cooling capacity help manage changing conditions. Entrances, tenant exhaust and long distribution routes should be considered when determining fresh-air quantity and building-pressure strategy.
Industrial and Manufacturing Facilities
Manufacturing facilities may need conditioned make-up air to replace process exhaust and support occupied areas. Specify filtration and materials for the actual environment. General ventilation equipment does not replace dedicated capture or treatment for hazardous process emissions.
Food and FMCG Facilities
Production spaces may require moisture control, hygienic surfaces and suitable filtration to support product and process conditions. Cleaning practices, zoning and exhaust arrangements influence selection. Preventing unwanted condensate and allowing access for inspection are important design priorities.
Educational and Institutional Buildings
Classrooms, lecture spaces and shared areas need ventilation matched to occupancy. Accessible filters, reliable fresh-air delivery and operating schedules support daily use. Demand-based control may be appropriate where the approved design permits modulation of ventilation quantity.
Airports and Transportation Facilities
Large public facilities can require substantial outdoor-air capacity across multiple zones. Robust filtration, coordinated fan control and practical service access are important. Intake exposure, operating hours and changing passenger occupancy should be included in the design basis.
Technical Specifications of Modular PAU Units
Modular PAU technical specifications are confirmed for the selected equipment and design conditions. There is no single airflow, panel thickness, motor rating or noise value that applies to every configuration. Request the project datasheet and approved submittal for actual ratings.
The table below identifies the specification details to confirm for your unit.
| Specification | Detail to confirm in the equipment selection |
|---|---|
| Airflow capacity – CFM / CMH | Required and selected airflow; CFM is cubic feet per minute and CMH is cubic metres per hour. |
| External static pressure | Available pressure for the external air path, with measurement boundaries stated. |
| Cooling medium | Chilled water or compatible DX refrigeration, as selected. |
| Cooling capacity | Total and sensible duty at stated entering-air and cooling-source conditions. |
| Coil configuration | Coil dimensions, circuiting and arrangement for the specified leaving-air condition. |
| Number of coil rows | Selected row count, supported by the coil performance calculation. |
| Tube material | Material and construction stated in the approved coil datasheet. |
| Fin material | Material, finish and fin spacing selected for performance and exposure. |
| Fan type | Selected fan design and performance curve. |
| Fan arrangement | Direct drive, belt drive or other approved arrangement; position in the air path. |
| Motor rating | Selected power rating and suitability for the operating duty. |
| Motor efficiency | Documented efficiency classification or performance data. |
| VFD availability | Motor compatibility, drive inclusion and control scope. |
| Filtration stages | Number, sequence and location of selected stages. |
| Filter classes | Documented particle-removal classifications and relevant test basis. |
| Panel construction | Inner and outer skins, joints, seals and access-panel details. |
| Single-skin / double-skin construction | Construction specified for the selected assembly. |
| Panel thickness | Actual selected panel thickness stated in the submittal. |
| Insulation type | Material, thermal characteristics and relevant fire-performance information. |
| Insulation density | Declared density for the selected insulation product. |
| Frame material | Selected structural-frame material and protective finish. |
| Internal casing material | Material and finish suited to air-stream and cleaning requirements. |
| External casing material | Material and protection suited to the installation environment. |
| Drain-pan material | Selected material, slope, outlet and cleaning provisions. |
| Unit orientation | Approved horizontal, vertical or stacked arrangement. |
| Indoor / outdoor construction | Installation rating and applicable weather-protection details. |
| Noise level | Declared sound data at stated operating and measurement conditions. |
| Electrical supply | Required voltage, phase, frequency and electrical load. |
| Control options | Controller, operating sequences, actuators and protection functions. |
| Available sensors | Included temperature, humidity, pressure and airflow instruments. |
| BMS compatibility | Communication interface, protocol, point list and integration responsibility. |
| Dimensions | Overall and individual shipping-section dimensions. |
| Weight | Operating and shipping weights, including section handling requirements. |
| Service-access provisions | Door positions, filter-removal space and coil or fan withdrawal clearances. |
Share your equipment schedule or consultant specification for a technical review and modular PAU project quotation.
How to Select the Right Modular PAU Unit
Start with the ventilation duty and required air conditions, then check whether the proposed unit fits the building and its utilities. Modular PAU unit selection should assess airflow, moisture removal and pressure together.
Required Fresh-Air Quantity
Determine outdoor-air quantity from occupancy, space use, process needs and the applicable ventilation design. State the required flow in CFM or CMH and identify zone distribution. Floor area alone is insufficient for reliable modular PAU sizing.
Outdoor Air Conditions
Provide project-location dry-bulb and wet-bulb conditions or equivalent moisture data. Consider the conditions that govern dehumidification, not only peak temperature. This is particularly important for coastal and monsoon-exposed locations where outdoor moisture loads can be substantial.
Required Supply-Air Conditions
Define the required discharge temperature and moisture condition. Confirm whether these apply at the coil outlet, unit outlet or room inlet. Fan heat and duct heat gain can alter supply temperature, so the selection basis should identify the relevant measurement point.
Sensible and Latent Cooling Load
Calculate the temperature-reduction and moisture-removal duties at the required airflow. Check the PAU's contribution to room loads and the remaining terminal-unit duty. A total cooling-capacity figure without stated air conditions does not demonstrate humidity performance.
Required External Static Pressure
Calculate the resistance of ducts, fittings, grilles and other components outside the unit's agreed boundary. Internal filters, coils and dampers must also be included in overall fan selection, separately from external resistance. Clearly defined boundaries prevent omissions and double counting.
Required Filtration Level
Select filter performance for outdoor-air quality, occupied-space needs and any process requirement. Check housing integrity, clean and final pressure drop, and replacement access. Higher efficiency should be coordinated with fan capacity and the full air-quality strategy.
Cooling Source
For chilled-water integration, verify available temperatures, flow and plant capacity. For DX systems, verify compatible condensing equipment, operating range and control interfaces. Review these utilities before approving a replacement or adding fresh-air duty to an existing system.
Fan and Motor Selection
Choose the fan against airflow and total required pressure at a suitable operating point. Review power, efficiency, speed-control capability and acoustic data. Service requirements for belts, bearings or direct-drive assemblies should fit the site's maintenance arrangements.
Installation Space and Access
Check the complete delivery route, including doors, corridors, lifts and lifting locations. Compare these with each shipping section's dimensions and weight. The final layout must also accommodate access doors, filter replacement, coil removal and safe maintenance work.
Indoor or Outdoor Installation
Confirm the installation environment before specifying casing and electrical protection. Outdoor units need suitable weatherproofing and support; indoor units still require condensation control and accessible drainage. Local corrosion exposure can influence material and finish selection.
Noise Requirements
Define acceptable sound conditions for the plant room and served spaces. Assess fan sound, duct transmission, casing radiation and structure-borne vibration. Acoustic treatment should be incorporated without overlooking its effect on pressure drop and installation dimensions.
Control and BMS Requirements
Prepare an operating sequence and required BMS point list. Identify which parameters must be measured, controlled, alarmed or trended. Confirm controller interfaces and responsibility for integration so that equipment, control-panel and building-system scopes align.
Future Maintenance Requirements
Consider inspection frequency, replacement-filter availability, component access and operating interruptions. Where an AMC is required, define preventive visits, performance checks, reporting and corrective-work scope. Planning serviceability during selection can reduce avoidable maintenance effort later.
Need help selecting a modular primary air handling unit? Send your airflow requirement, supply-air targets and site layout for an engineering discussion.
Modular PAU vs Other Air-Handling Systems
Equipment names do not replace a performance specification. HVAC terminology can vary between manufacturers, consultants and project documents, so compare actual duties, construction and verified operating conditions.
Modular PAU vs Conventional / Fixed-Configuration PAU
Both arrangements can perform the same fresh-air treatment duty when correctly selected. The main differences relate to construction, configuration and installation practicality.
| Consideration | Modular PAU | Conventional / fixed-configuration PAU |
|---|---|---|
| Construction | Uses individual sections or approved sectional assemblies. | Uses a predetermined assembly, often delivered as a complete unit. |
| Configuration flexibility | Section choices depend on the selected modular platform. | Choices follow the available fixed configurations. |
| Site assembly | Approved sections may be joined on site. | Site assembly depends on the product's delivery arrangement. |
| Installation access | Section sizes can help accommodate restricted routes. | The delivered assembly must fit the access route. |
| Customization | Can allow project-specific treatment sections and layout. | Customization is limited to the manufacturer's supported options. |
| Maintenance | Depends on access doors, clearances and section design. | Depends on access doors, clearances and component layout. |
| Space utilization | Supported horizontal, vertical or stacked options may help. | Requires space suited to the available unit arrangement. |
| Future modification | Possible where structural and component compatibility permit. | Possible only within the product's approved limits. |
| Suitable applications | Complex treatment duties, restricted access and customized layouts. | Projects well served by an available standard configuration. |
Modular PAU vs AHU
A PAU is an air-handling assembly selected for primary or dedicated outdoor-air duty. AHU is a broader equipment term; an AHU can also be designed for 100% outdoor air. The distinction is the specified function, not an automatic difference in quality or capacity.
| Consideration | Modular PAU in a dedicated fresh-air application | General AHU application |
|---|---|---|
| Primary function | Treats ventilation or make-up outdoor air. | Conditions and distributes air for the specified zone or system. |
| Fresh-air percentage | Typically selected for 100% outdoor air. | Can use return air, mixed air or 100% outdoor air. |
| Recirculation | Normally excluded from the dedicated outdoor-air path. | May be included where the application permits. |
| Cooling | Selected for the outdoor-air treatment duty. | Selected for the combined load assigned to the AHU. |
| Humidity control | Must address the specified outdoor-air moisture duty. | Depends on coil selection and the required control strategy. |
| Filtration | Selected for intake quality and application requirements. | Selected for the air stream and application requirements. |
| Integration | Coordinates with terminal cooling, ducts and controls. | May serve rooms directly or integrate with terminal equipment. |
| Typical applications | Centralized ventilation and conditioned make-up air. | Comfort cooling, process air handling and outdoor-air treatment. |
Modular PAU vs TFA / FAHU
PAU, TFA and FAHU terminology often overlaps. A TFA unit generally describes treated fresh-air equipment, while FAHU describes a fresh air handling unit. These names alone do not establish size, dehumidification performance or modular construction.
| Consideration | Modular PAU | TFA / FAHU |
|---|---|---|
| Terminology | Describes primary-air duty with modular construction. | Describes treated fresh air or fresh-air handling; construction varies. |
| Purpose | Provides the specified primary fresh-air treatment. | Provides fresh-air handling or treatment as specified. |
| Fresh-air treatment | Usually selected for dedicated outdoor-air duty. | Outdoor-air duty depends on the project definition. |
| Cooling | Chilled-water or compatible DX selection. | May include chilled-water or DX cooling; confirm the equipment scope. |
| Dehumidification | Depends on the selected coil and control duty. | Must be specified and verified; the name alone does not guarantee it. |
| Filtration | Application-specific stages and performance. | Application-specific stages and performance. |
| Applications | Commercial, industrial and controlled-environment ventilation. | Similar applications, depending on capacity and specified treatment. |
| System integration | Can coordinate with centralized or zone-based HVAC. | Can coordinate with centralized or zone-based HVAC. |
Energy Efficiency Considerations for Modular PAU Units
Energy-efficient modular PAU operation depends on the complete system. Compare fan power, cooling and heating demand, controls and maintenance over the intended operating hours. Modular construction by itself does not guarantee lower energy consumption.
Fan Efficiency
A fan and motor selected near an efficient operating point can reduce power for the required air delivery. Lower losses also reduce heat added to the air stream. Appropriate sizing supports lower operating cost without sacrificing ventilation performance.
VFD and EC Fan Control
VFD or EC control can adjust fan speed to the approved airflow demand. Where ventilation quantity may decrease, both fan power and outdoor-air treatment load can fall. Savings depend on the control strategy; minimum ventilation, humidity and pressure requirements must remain satisfied.
Low-Pressure-Drop Filtration
Selecting suitable filter area and media can reduce fan resistance while preserving required particle-removal performance. This directly affects fan power and filter operating cost. It does not directly reduce the outdoor-air cooling load, but can lower the fan heat that cooling equipment must handle.
Coil Selection and Air-Side Pressure Drop
Coil sizing should balance heat transfer, moisture removal and resistance. Excessive pressure drop increases fan power, while inadequate coil duty can compromise humidity control. Evaluate coil performance and fan energy together to support efficient operation at the required supply condition.
Thermal Insulation and Casing Performance
Insulation limits unwanted heat gain or loss, while effective sealing helps deliver the intended treated airflow. These influence cooling demand and wasted treatment energy. Casing leakage may also increase the airflow needed to achieve the required delivery, affecting fan power and operating cost.
Heat and Energy Recovery Options
Suitable recovery equipment can reduce outdoor-air heating or cooling demand; moisture-transfer devices may also reduce latent duty. Added air resistance, pumps and drives consume energy. Assess the net benefit across climate, operating hours, exhaust quality and maintenance needs before selecting recovery.
Demand-Based Fresh-Air Control
Where the ventilation design permits, occupancy or other demand signals can adjust outdoor-air delivery. Appropriate modulation can reduce fan power and the amount of air requiring treatment. Control limits must maintain required ventilation, moisture management and pressure relationships throughout operation.
BMS-Based System Optimization
Schedules, setpoints and operating trends can reveal unnecessary running, excessive fan pressure or simultaneous cooling and reheat. Correcting these issues can reduce fan and thermal energy. Useful optimization requires reliable sensors, defined control limits and review of actual building needs.
Filter and Coil Maintenance
Dirty filters increase resistance; fouled coils can reduce heat transfer and raise pressure drop. Maintenance helps preserve airflow, cooling and moisture-removal performance. At constant airflow, cleaner components can reduce fan demand; in unregulated systems, servicing can restore airflow lost through blockage.
Modular PAU Installation and Site Integration
Successful modular PAU installation connects the equipment with its support structure, air distribution, cooling utilities, drainage and controls. Review these interfaces before delivery so the assembled system can achieve the specified duty.
Equipment Delivery and Section Handling
Verify the delivery route and lifting plan against each section's dimensions, weight and approved lifting points. Inspect delivered sections for transport damage. Protect coils, filter frames, panel joints and controls during movement and temporary storage.
Section Assembly and Alignment
Join sections in the approved sequence on a level support. Fit the specified joint seals and fasteners, checking alignment of the internal air path. Poorly sealed connections can cause leakage or allow untreated air to enter downstream of filters.
Base Frame and Vibration Isolation
Supports should distribute operating loads without distorting the casing. Select vibration isolators for the equipment weight and operating characteristics. Where flexible duct or pipe connections are used, coordinate them with the isolation design so rigid connections do not bypass it.
Duct Connections
Connect ducts with suitable transitions, sealing and independent support. Avoid abrupt changes that disturb airflow near fans or coils. Insulate treated-air ducts where required and provide balancing and measurement access appropriate to the distribution layout.
Chilled-Water Connections
Coordinate coil supply and return connections with the approved piping arrangement. Provide specified isolation, control, straining, venting and balancing provisions. Flush and test the system, then confirm coil water flow and temperatures against the equipment selection.
Refrigerant Connections for DX Systems
Refrigerant piping must suit the selected coil, condensing equipment and refrigerant. Confirm approved pipe sizes, routing, length limits and control connections. Installation, pressure testing, evacuation and charging should follow the specific equipment instructions and project requirements.
Condensate Drain Connection
Provide sufficient space for the required trap, a suitable drain gradient and cleaning access. Trap dimensions depend on pressure at the outlet. Verify that condensate discharges during fan operation and that the drainage arrangement prevents unwanted air or contaminated-water entry.
Electrical Connections
Confirm electrical supply against the selected motor, heaters, drives and control panel. Coordinate cable sizing, isolation, protection and earthing with the approved design. Check phase sequence where applicable and complete electrical inspections before starting the equipment.
Control Wiring
Install sensor and actuator wiring according to the control schematic. Coordinate signal types, power supplies and cable segregation to reduce interference. Check instrument positions and point identification before testing the complete operating sequence.
BMS Integration
Confirm the communication interface, point list and integration responsibility before commissioning. Test status, alarms, measured values and permitted commands. Local equipment protection should remain effective during communication failure and under remote control.
Maintenance and Service Clearance
Keep access routes and component withdrawal spaces clear after ducting, pipes and cables are installed. Verify that doors can open fully and filters can be removed. The final layout should allow coil, drain and fan servicing throughout the equipment's operating life.
Contact Compress India for modular PAU installation services, replacement planning or integration with your existing HVAC system.
Testing and Commissioning of Modular PAU Units
Commissioning should demonstrate operation against the approved design and record the conditions during testing. Measured results need to be interpreted alongside outdoor conditions, cooling-source availability and instrument accuracy.
Airflow Measurement
Measure total airflow using an appropriate calibrated method and check distribution to the served zones. Compare readings with the approved schedule. Fan-speed indication alone does not confirm actual ventilation delivery.
Static-Pressure Verification
Measure pressure at defined locations and compare the results with the selection basis. Distinguish external resistance from internal component losses. Unexpected pressure readings can indicate blocked filters, duct restrictions, damper issues or measurement-boundary differences.
Cooling-Coil Performance Testing
Record entering and leaving air conditions together with airflow and cooling-medium conditions. For chilled-water coils, include water temperatures and flow where measurable. Evaluate DX operation against its approved duty and equipment-specific commissioning requirements.
Supply-Air Temperature Verification
Check supply temperature at the specified acceptance point under stable operation. Account for fan heat, reheat and downstream duct gains. Verify that control action maintains the required condition rather than relying on a single favourable reading.
Humidity and Dew-Point Verification
Measure temperature and humidity together and establish the corresponding moisture condition. Compare supply-air dew point or humidity ratio with the design requirement. Room RH alone does not isolate PAU performance from infiltration or internal moisture sources.
Filter Pressure-Drop Verification
Record the initial pressure drop across each fitted filter stage at the tested airflow. Check filter identity, seating and bypass seals. Set pressure alarms and service limits according to the selected filters and approved operating requirements.
Fan and Motor Checks
Verify rotation, speed, mounting and operating current. Inspect belts and alignment where fitted, and check fan or motor bearings as applicable. Compare operation with the selected fan duty and motor limits.
Electrical Load Verification
Record relevant voltage, phase currents and power readings at the operating condition. Check protection settings and load balance where applicable. Include heaters, drives and auxiliary equipment when assessing the full unit load.
Vibration and Noise Checks
Assess equipment vibration, isolator performance and unusual operating sound. Review fan balance, mounting and nearby structural transmission if readings are unacceptable. Acoustic verification should use the measurement conditions agreed for the project.
Condensate Drainage Testing
Confirm effective pan drainage and trap operation with the fan running. Check for pooling, leaks, overflow and moisture carryover. Drainage performance should be demonstrated before the system is handed over for routine operation.
Sensor Calibration
Compare installed sensors with suitable reference instruments and check controller scaling. Confirm that sensor positions represent the air conditions being controlled. Record any adjustment so later readings can be compared with the commissioning baseline.
Control Sequence Verification
Test start-up, shutdown, cooling, reheat, dampers and fan control against the approved sequence. Include applicable airflow proving, heater protection and fault responses. Check how the system behaves under part-load operation and relevant simulated failures.
BMS Communication Verification
Confirm point mapping, engineering units, alarm transmission and permitted remote commands. Test communication-loss behaviour and trend recording where included. Handover should clearly identify the operating setpoints and responsibilities for future changes.
Maintenance and Serviceability of Modular PAU Units
Regular modular PAU preventive maintenance supports consistent airflow, moisture control and equipment reliability. Visit frequency should reflect operating hours, outdoor dust, application sensitivity and the selected equipment's instructions.
Filter Inspection and Replacement
Inspect filter condition, seals and pressure drop. Replace filters when their specified service limits or application requirements call for it; there is no universal replacement interval. Wash only filters designed for cleaning, and avoid reusing damaged or unsuitable media.
Cooling-Coil Cleaning
Inspect coil faces for dust, fouling and damaged fins. Use cleaning methods compatible with the coil materials and coatings. Keeping the air path clean helps preserve heat transfer, moisture removal and manageable air-side resistance.
Drain Pan and Drain-Line Maintenance
Clean pans, outlets and traps, checking for standing water and blocked discharge. Confirm trap seals and drainage during operation. Regular attention helps prevent overflow, wet insulation and contamination within the unit.
Fan Inspection
Check impeller cleanliness, balance, fasteners and free movement. Deposits or damage can change airflow and vibration. Investigate unusual sound or reduced delivery before adjusting fan speed to compensate for an unidentified fault.
Motor Inspection
Review motor mounting, connections, operating current and signs of overheating. Inspect bearings and cooling provisions according to the motor design. Lubrication or other servicing should follow the equipment instructions rather than a general schedule applied to every motor.
Belt Inspection Where Applicable
Inspect belts for wear, tension and pulley alignment. Incorrect tension can reduce drive performance or overload bearings. Use the specified belt type and replacement method, then verify fan speed and operation after adjustment.
Vibration Monitoring
Compare vibration with the commissioning baseline and investigate changes. Fan imbalance, worn bearings, loose fasteners or damaged isolators may be involved. Trending helps identify deterioration before it produces wider equipment or structural problems.
Panel, Door and Gasket Inspection
Check casing joints, panel condition, door latches and seals. Air leakage can waste treated air or bypass filtration. Repair damaged gaskets and insulation, paying attention to corrosion, moisture ingress and condensation marks.
Sensor Calibration
Verify temperature, humidity and pressure sensors at intervals suited to their duty. Incorrect readings can drive unnecessary cooling, reheat or fan operation. Check both the instrument and controller scaling when investigating a control problem.
Differential-Pressure Monitoring
Review filter and other monitored pressure readings against airflow and service history. Check that sensing tubes are clear and connected correctly. A changed pressure reading should be investigated in context rather than assumed to indicate filter blockage alone.
Periodic Airflow and Performance Verification
Recheck airflow, supply conditions, drainage and electrical readings against the baseline. This can identify gradual performance loss that routine visual inspection misses. Include operating trends where available to evaluate both peak and part-load conditions.
For low airflow, high humidity, condensate leakage, unusual noise or high power consumption, request modular PAU troubleshooting services. A structured diagnosis helps establish whether cleaning, control adjustment, repair, retrofitting or replacement is appropriate.
Ask about a modular PAU annual maintenance contract with a defined visit schedule, inspection scope and service records.
Engineering, Build Quality and Quality Assurance
Reliable performance comes from a clear design basis, suitable components, careful installation and documented verification. These should be reviewed together when assessing equipment and contractor proposals.
Equipment Selection and Engineering Validation
Check the selection against approved outdoor conditions, airflow, leaving-air targets, cooling load and pressure. Review filtration and utility compatibility together with the fan and coil calculations. Resolve differences between consultant schedules and actual site conditions before final equipment approval.
Material and Component Quality
Confirm casing, insulation, coil, fan, motor, filter and damper details against approved submittals. Review component suitability for corrosion exposure, cleaning and operating conditions. Control-panel and instrumentation quality also influence the reliability of the completed system.
Equipment Sourcing / Manufacturing Basis
Compress India's role is HVAC engineering, site integration, installation, commissioning and service. Where equipment supply is included in the agreed scope, the project quotation should identify the selected OEM or supplier, equipment specification and warranty responsibility. Manufacturing origin is established through the equipment documentation and approved submittals.
Inspection and Quality Checks
Inspect dimensions, section alignment, casing seals, coil condition, fan mounting and filter installation. Verify electrical and control-panel work against approved drawings. Record and resolve defects before performance testing rather than allowing them to become operating problems.
Performance Testing and Commissioning Documentation
Handover records should include tested airflow, pressure, air conditions, electrical readings and relevant control checks. State the conditions, instruments and acceptance basis used during testing. These records provide a useful reference for future servicing and performance investigation.
Applicable Standards and Project Specifications
Identify the requirements applicable to the selected equipment, building use and project location in the approved specification. Filtration classification, casing performance, electrical requirements and any specialist hygiene obligations should be documented as relevant. Certification claims must be supported by the specific equipment's valid documentation.
Information Required for Modular PAU Selection
A useful quotation starts with a clear design brief. Share the following information where available; if your project is at an early stage, send the drawings and known requirements so the remaining inputs can be identified.
- Project location: City, site address and relevant environmental exposure.
- Building/application type: Offices, healthcare, hospitality, manufacturing or other intended use.
- Required fresh-air quantity: Total ventilation or make-up-air demand and zone distribution.
- Airflow in CFM / CMH: Design airflow with the measurement unit clearly stated.
- Outdoor dry-bulb temperature: Approved location-specific design value.
- Outdoor wet-bulb temperature: Corresponding design value or equivalent moisture-condition data.
- Outdoor relative humidity: Humidity condition associated with the stated temperature and design case.
- Required supply-air temperature: Target temperature and the point at which it must be achieved.
- Required supply-air RH: Target relative humidity at the stated supply temperature, if specified.
- Required dew point: Supply-air moisture target where humidity control is critical.
- Cooling source: Chilled-water plant or proposed compatible DX system.
- Chilled-water supply temperature: Available coil inlet-water condition, where applicable.
- Chilled-water return temperature: Intended coil outlet-water condition, where applicable.
- External static pressure: Required pressure with the external system boundary identified.
- Filtration requirement: Required stages, filter classifications and testing expectations.
- Indoor or outdoor installation: Plant-room, exposed outdoor or roof-mounted location.
- Available installation space: Footprint, height and access-route restrictions.
- Preferred unit orientation: Horizontal, vertical or an approved stacked arrangement.
- Noise requirement: Acoustic criteria for the equipment area and occupied spaces.
- Casing/material requirements: Panel construction, corrosion protection and internal surface preferences.
- Electrical supply: Available voltage, phase, frequency and power capacity.
- BMS requirement: Existing platform, communication interface and required point list.
- Control requirement: Operating schedules, temperature and humidity control, alarms and interlocks.
- Heat-recovery requirement: Recovery objective and available exhaust-stream information.
- Humidification requirement: Moisture-addition duty, preferred method and available utilities.
- Special hygiene requirements: Cleaning, drainage and material criteria relevant to the application.
- Process-specific requirements: Required operating conditions, zoning and pressure relationships.
- Maintenance-access requirement: Filter, coil and fan service clearances and component removal routes.
The modular PAU unit price depends on airflow, cooling duty, filtration, casing, fan selection, controls and optional treatment sections. Installation cost is also affected by site access, ductwork, piping, drainage, electrical connections and commissioning scope. Compare quotations against the same technical duty and clearly defined inclusions.
For a modular PAU annual maintenance contract, provide the existing unit details, operating hours, service history and known faults. AMC pricing depends on visit frequency, inspection scope, consumables, corrective-work coverage and reporting requirements. Comparing lifecycle cost alongside initial price gives a more useful basis for project decisions.
Request a quotation: Send your drawings, equipment schedule or current-system details to info@compressindia.com, or call +91 9920529961 to discuss your requirements.
Connect with Our HVAC Engineering Team
For professional installation, commissioning, repair, retrofitting, automation integration, preventive maintenance, or AMC services for Primary Air Handling Units (PAU), connect with our HVAC engineering team for centralized fresh air treatment solutions.
Related Primary Air Handling Units (PAU)
Explore other primary air handling unit configurations for different cooling sources, airflow duties, installation arrangements and humidity control needs.

DX Based Primary Air Handling Units
Learn More
Chilled Water Based PAU Systems
Learn More
High Static Pressure PAUs
Learn More
Low Temperature Dehumidification PAUs
Learn More
Roof Mounted PAU Units
Learn MoreFrequently Asked Questions About Modular PAU Units
What is a Modular PAU Unit?
A Modular PAU Unit is a sectional Primary Air Handling Unit designed for a specified fresh-air treatment duty. It combines selected sections such as intake dampers, filters, cooling coils and fans. Its purpose is to deliver outdoor air at the required airflow, cleanliness and temperature or moisture condition.
How is a Modular PAU different from a standard PAU?
The main difference is sectional construction and the configuration options supported by the equipment platform. Modular sections can help with restricted access and customized treatment requirements. Cooling and humidity performance still depend on equipment selection; a fixed-configuration PAU can also perform well when correctly specified.
What sections can be included in a Modular PAU?
Depending on the design, sections can include outdoor-air intake, dampers, pre-filters, fine or HEPA filters, cooling coils, heating or reheat, fans, heat recovery, humidification and silencers. Sensors and controls coordinate these functions. The final sequence should match the application and selected equipment's capabilities.
Can a Modular PAU use both chilled-water and DX cooling?
Modular PAUs can be configured for either chilled-water or compatible DX cooling. A unit is not automatically interchangeable between the two. A combined or dual-source arrangement requires a specific engineering design, appropriate coils and coordinated controls, with availability confirmed for the selected equipment.
What filtration options are available in Modular PAU Units?
Options may include pre-filters, fine filters, bag filters and specified HEPA stages. Select filtration against outdoor-air quality and the application's particle-control needs. Confirm filter classification, housing seals, pressure drop and maintenance access. Gas or odour removal requires separately selected treatment where needed.
How is the required Modular PAU capacity selected?
Selection considers airflow, outdoor design conditions, required supply-air temperature and moisture level, cooling source, filtration and system pressure. Both sensible and latent loads matter. Installation dimensions, noise and control requirements must also be checked before the final capacity and configuration are approved.
Can Modular PAU Units control humidity?
Yes, when selected and controlled for the required moisture-removal duty. A cooling coil can condense moisture when its surface is below the air's dew point. Optional reheat adjusts supply temperature afterwards. Room humidity also depends on ventilation quantity, internal moisture, infiltration and the wider HVAC design.
Can Modular PAU Units be integrated with a BMS?
Yes, where compatible controllers and communication interfaces are provided. Integration can expose temperature, humidity, fan status, filter pressure and alarms, together with approved commands. Confirm the protocol, point list and operating sequence before installation, then verify communication and protection functions during commissioning.
Are Modular PAU Units suitable for pharmaceutical, hospital and cleanroom applications?
They can support these applications when the complete configuration meets the approved requirements. Filtration, cleanability, materials, drainage, moisture control and pressure strategy require application-specific selection. Suitability and any certification or validation obligations must be established for the particular area and complete HVAC system.
What maintenance is required for a Modular PAU Unit?
Maintenance includes filters, coils, fans, motors, drains, seals, sensors and controls, plus belts where fitted. Periodic airflow and supply-condition checks help detect deterioration. Filter replacement and visit intervals depend on condition, operating hours, outdoor contamination and application requirements. An agreed AMC can organize these tasks and records.